- Instructions for Form 7211 - Introductory Material
- General Instructions
- Purpose of Form
- How To Claim the Credit
- Applicable entities.
- Credit transfers.
- Pre-filing registration requirement for payments or transfers.
- Process for Filing a Provisional Emissions Rate (PER) Petition
- Credit Reduced for Tax-Exempt Bonds
- Increased Credit in Energy Communities
- Domestic Content Bonus Credit
- Prevailing Wage and Apprenticeship Requirements
- Specific Instructions
- Instructions for Form 7211 - Notices
Future Developments
For the latest information about developments related to Form 7211 and its instructions, such as legislation enacted after they were published, go to IRS.gov/Form7211.
What’s New
New Form 7211.
Beginning in 2025, Form 7211, Clean Electricity Production Credit, will be used to claim the section 45Y clean electricity production credit.
Tax-exempt and governmental entities.
Applicable entities (such as certain tax-exempt and governmental entities) can elect to treat the clean electricity production credit as a payment of income tax. See Applicable entities, later.
Credit transfers.
Eligible taxpayers, partnerships, and S corporations can elect to transfer all or part of the credit amount otherwise allowed as a general business credit to an unrelated third-party buyer in exchange for cash. Eligible taxpayers don't include applicable entities. See Credit transfers, later.
Pre-filing registration.
The IRS has established a pre-filing registration process that must be completed prior to electing payment or transfer of the clean electricity production credit. See Pre-filing registration requirement for payments or transfers , later.
Purpose of Form
Use Form 7211 to claim the clean electricity production credit that you produced at each qualified facility. Complete Part I to report the information on the qualified facility. The credit is allowed for electricity produced in the United States or U.S. territories at a qualified facility and sold by the taxpayer to an unrelated person during the tax year or, in the case of a qualified facility that is equipped with a metering device that is owned and operated by an unrelated person, sold, consumed, or stored by the taxpayer during the tax year. Complete Part II to calculate the credit.
Taxpayers, applicable entities, partnerships, S corporations, estates, or trusts that own and operate a qualified facility must file a separate Form 7211 for each qualified facility to claim the credit. All others are generally not required to complete or file this form if their only source for any section 45Y clean electricity production credit is a partnership, S corporation, estate, trust, or cooperative. Instead, they can report this credit directly on Form 3800, General Business Credit. The following exceptions apply.
-
You are a(n) estate or trust and the source of the credit can be allocated to beneficiaries. For more details, see the instructions for Form 1041, Schedule K-1, box 13, code E.
-
You are a cooperative and the source credit can or must be allocated to patrons. For more details, see the instructions for Form 1120-C, Schedule J, line 5c.
A qualified facility will not include any facility for which a credit determined under section 45, 45J, 45Q, 45U, 48, 48A, or 48E is allowed under section 38 for the tax year or any prior tax year.
How To Claim the Credit
To qualify for the credit, the electricity must be produced within either the United States (as defined in section 638(1)), or a territory of the United States (as defined in section 638(2)). Additionally, eligible electricity is electricity that is either: (1) sold by the taxpayer to an unrelated person during the tax year, or (2) in the case of a qualified facility that is equipped with a metering device, which is owned and operated by an unrelated person, sold, consumed, or stored by the taxpayer during the tax year.
Amount of Credit
The clean electricity production credit for any tax year is an amount equal to the product of kilowatt hours (kWh) of eligible electricity produced by the taxpayer at a qualified facility, multiplied by the applicable amount with respect to the qualified facility.
Applicable Amount
Base amount.
For any qualified facility that does not satisfy the requirements for the alternative amount, the applicable amount will be 0.3 cents.
Alternative amount.
For any qualified facility that (1) has a maximum net output of less than one megawatt (as measured in alternating current); (2) the construction of which began before January 29, 2023; or (3) meets the prevailing wage and apprenticeship requirements, the applicable amount will be 1.5 cents. See Prevailing Wage and Apprenticeship Requirements, later.
Inflation adjustment factor.
The base amount and the alternative amount is adjusted by the inflation adjustment factor for the calendar year in which the sale, consumption, or storage of the electricity occurs. When released, the inflation adjustment will be available on IRS.gov.
If the base amount of 0.3 cents, when multiplied by the inflation adjustment factor for the calendar year, is not a multiple of 0.05 cent, the amount must be rounded to the nearest multiple of 0.05 cent.
If the alternative amount of 1.5 cents, when multiplied by the inflation factor for the calendar year, is not a multiple of 0.1 cent, the amount must be rounded to the nearest multiple of 0.1 cent.
Definitions
CO2e per kWh.
The term “CO2e per kWh” means, with respect to any greenhouse gas, the equivalent carbon dioxide (as determined based on global warming potential) per kilowatt hour of electricity produced.
Greenhouse gas.
The term “greenhouse gas” has the same meaning given to the term under section 211(o)(1)(G) of the Clean Air Act (42 U.S.C. 7545(o)(1)(G)).
Greenhouse gas emissions rate.
Generally, the amount of greenhouse gases emitted into the atmosphere by a facility in the production of electricity, expressed as grams of CO2e per kWh.
Qualified facility.
A facility owned by the taxpayer that is used for the generation of electricity, that is placed in service after 2024, and for which the greenhouse gas emissions rate (as determined under section 45Y(b)(2)) is not greater than zero. The facility will be treated as a qualified facility during the 10-year period beginning on the date the facility was originally placed in service.
Qualified carbon dioxide.
This is carbon dioxide captured from an industrial source that:
-
Would otherwise be released into the atmosphere as industrial emission of greenhouse gas,
-
Is measured at the source of capture and verified at the point of disposal or utilization, and
-
Is captured and disposed or utilized within the United States or a territory.
Applicable entities.
Applicable entities (as defined under section 6417(d)(1)(A)) that generally don't benefit from income tax credits can elect to treat the clean electricity production credit for a facility originally placed in service after December 31, 2024, as a payment of income tax. Resulting overpayments may result in refunds.
Applicable entities making the elective payment election for the clean electricity production credit must file the following.
-
Form 7211 and any applicable attachments;
-
Form 3800, General Business Credit; and
-
Form 990-T, Exempt Organization Business Income Tax Return, or other applicable income tax return.
For a discussion of what is an applicable entity, see Applicable entity making an EPE on IRA 2022 credits in the Instructions for Form 3800. For more information on elective payment elections under section 6417, see Elective Payment of Certain Business Credits Under Section 6417 or Section 48D in the Instructions for Form 3800.
Your election to treat the credit as a payment generally applies to the year you make the election and any subsequent year within the 10-year period beginning on the date such facility was originally placed in service. You must obtain an IRS-issued registration number for the facility in the year you make the election and each of the succeeding years.
Credit transfers.
Under section 6418, eligible taxpayers, partnerships, and S corporations can elect to transfer all or part of the credit figured in Part II to an unrelated third-party buyer in exchange for cash. Eligible taxpayers don’t include applicable entities. For more information on credit transfers, see Transfer of Eligible Credits Under Section 6418 in the Instructions for Form 3800.
Pre-filing registration requirement for payments or transfers.
Before you file your tax return, if you intend to make an elective payment election or transfer election on Form 3800 for the clean electricity production credit, you must complete a pre-filing registration for each qualified facility. To register, go to IRS.gov/Credits-Deductions/Register-for-Elective-Payment-or-Transfer-of-Credits. See Pub. 5884, Inflation Reduction Act (IRA) and CHIPS Act of 2022 (CHIPS) Pre-filing Registration Tool, for more information. Also see Registering for and Making EPEs and Transfer Elections in the Instructions for Form 3800.
Process for Filing a Provisional Emissions Rate (PER) Petition
To file a PER petition with the Secretary, a taxpayer must submit a PER petition by attaching it to the taxpayer’s federal income tax return, for the first tax year in which the taxpayer claims the section 45Y credit with respect to the facility to which the PER petition applies. The PER petition must contain an emissions value and, if applicable, the associated letter from the Department of Energy (DOE). For more information, see TD 10024 .
Credit Reduced for Tax-Exempt Bonds
The credit is reduced by an amount that is the product of the credit amount otherwise determined for the tax year and the lesser of 15% or a fraction determined for the tax year. The numerator of the fraction is the sum, for the tax year and all prior tax years, of proceeds of an issue of any obligations the interest on which is exempt from tax under section 103 and that is used to provide financing for the qualified facility as of the close of the tax year. The denominator of the fraction is the aggregate amount of additions to the capital account for the qualified facility for the tax year and all prior tax years as of the close of the tax year.
Increased Credit in Energy Communities
In the case of any qualified facility that is located in an energy community, the amount of credit with respect to any electricity produced by the taxpayer at such facility is increased by 10%. Energy community means (a) a brownfield site; (b) a metropolitan or non-metropolitan statistical area that has or had at any time during the period beginning in 2010, 0.17% or more direct employment or 25% or greater local tax revenues related to the extraction, processing, transport, or storage of coal, oil, or natural gas, and has an unemployment rate at or above the national average unemployment rate for the previous year; or (c) a census tract in which after December 31, 1999, a coal mine has closed, or after December 31, 2009, a coal-fired electric generating unit has been retired, or a census tract directly adjoining to any such census tract.
See Notice 2023-29, available at IRS.gov/irb/2023-29_IRB#NOT-2023-29; Notice 2023-45, available at IRS.gov/irb/2023-45_IRB#NOT-2023-45; and Notice 2023-47, available at IRS.gov/irb/2023-47_IRB#NOT-2023-47, for more information about the energy community bonus credit guidance under section 45.
Domestic Content Bonus Credit
An additional bonus credit equal to 10% of the amount is provided for projects that meet a domestic content requirement. The domestic content bonus requires that certain steel, iron, and manufactured products used in the facility be domestically produced. The taxpayer needs to certify that any steel, iron, or manufactured product that is a component of the qualified facility (upon completion of construction) was produced in the United States (as determined under section 661 of Title 49, CFR).
Prevailing Wage and Apprenticeship Requirements
Prevailing Wage Requirements
To meet the prevailing wage requirements with respect to any qualified facility, a taxpayer must ensure that any laborers and mechanics employed by the taxpayer or any contractor or subcontractor in:
-
The construction of such facility, and
-
The alteration or repair of such facility (with respect to any tax year, for any portion of such tax year that is within the 10-year period beginning on the date the qualified facility is originally placed in service), are paid wages at rates not less than the prevailing rates.
-
Special correction and penalty mechanisms apply for a taxpayer’s failure to satisfy the prevailing wage requirements.
Apprenticeship Requirements
The apprenticeship requirements include three components: a labor-hours requirement, a ratio requirement, and a participation requirement.
-
The taxpayer must ensure that, depending on when construction began, 10% to 15% of the total labor hours performed in the construction, alteration, or repair of the facility are performed by qualified apprentices from a registered apprenticeship program.
-
The taxpayer must ensure that the applicable ratio of apprentices to journeyworkers established by the registered apprenticeship program are met for apprentices working on the facility each day.
-
Any taxpayer (or contractor or subcontractor) that employs four or more individuals in the construction, alteration, or repair of the facility must also hire at least one qualified apprentice.
For more information on the prevailing wage and apprenticeship requirements, including applicable exceptions, see Frequently asked questions about the prevailing wage and apprenticeship under the Inflation Reduction Act.
Part I—Information on Qualified Facility
If you are claiming the clean electricity production credit for a qualified facility, you must complete Part I, Information on Qualified Facility. Use lines 1 through 9 to provide information for each facility.
Line 1
Enter your pre-filing registration number of the facility that you received from the IRS. See Pre-filing registration requirement for payments or transfers , earlier.
Line 2a
If the owner of the facility is different from the filer, include the owner’s name and taxpayer identification number.
Lines 2b and 2c
Enter the address and the technical description of the facility on line 2b. Enter the coordinates of the facility (longitude and latitude) on line 2c.
Line 7
Check the appropriate box on line 7 and attach the required information to your return to claim the credit at the alternative amount. See TD 9998 for additional information.
Additional information to claim the alternative amount.
If you checked the “Yes” box in Part I, question 7a, 7b, or 7c, and entered an alternative amount on Part II, line 2, you must also attach a statement to Form 7211 that includes the following information.
-
Your name and taxpayer identification number and the facility description (including owner information, if different from filer) and the IRS-issued registration number (if applicable) from Part I.
-
If you checked box 7a, a statement that the facility or property has a maximum net output of less than 1 megawatt (as measured in alternating current).
-
If you checked box 7b, a statement that you met the Continuity Requirement under the Physical Work Test or the Five Percent Safe Harbor to establish the beginning of construction before January 29, 2023.
-
If you checked box 7c, include the following.
-
The location and type of the qualified facility.
-
The applicable wage determinations (as defined below) for each classification of laborer and mechanic who performed work on the construction, alteration, or repair of the facility.
-
The wages paid (including any correction payments as defined in section 45(b)(7)(B)(i)(I)) and hours worked for each of the laborer or mechanic classifications engaged in the construction, alteration, or repair of the facility.
-
The number of laborers and mechanics who received correction payments as the result of any failure to pay the applicable prevailing wage rates.
-
The amount of penalty payments owed with respect to any failures to pay the applicable prevailing wage rates.
-
The wages paid and hours worked by qualified apprentices for each of the laborer or mechanic classifications engaged in the construction of the facility.
-
The total labor hours for the construction of the project by any laborer or mechanic employed by the taxpayer or any contractor or subcontractor.
-
The amount of hours for which you claim to have satisfied the apprenticeship requirements under the good-faith effort exception.
-
The amount of penalty payments owed with respect to any failure to meet the labor-hours requirement or the participation requirement.
-
-
A declaration, applicable to the statement and any accompanying documents, signed by you, or signed by a person currently authorized to bind you in such matters, in the following form: “Under penalties of perjury, I declare that I have examined this statement, including accompanying documents, and to the best of my knowledge and belief, the facts presented in support of this statement are true, correct, and complete.”
Applicable wage determinations.
These are the wages listed for a particular laborer or mechanic classification for the type of construction and the geographic area, or other applicable wage as determined by the Secretary of Labor.
Line 8
Section 45Y(g)(7) provides an energy community bonus credit amount for a qualified facility by increasing the amount by 10% if the qualified facility is located in an energy community. Check “Yes” if you satisfy the section 45Y(g)(7) requirements. See Increased Credit in Energy Communities , earlier.
Line 9
Check the appropriate box on line 9.
If you checked line 9 to claim the domestic content bonus credit amount in Part I, you must also attach a domestic content certification statement to Form 7211 at the time of filing your return for each applicable project. The domestic content certification statement should include the following.
-
Your name and taxpayer identification number shown on the return.
-
The facility description (including owner information, if different from filer) and the IRS-issued registration number (if applicable) of the applicable project from Part I.
-
A statement that any steel, iron, or manufactured product that is a component of the facility (upon completion of construction) was produced in the United States (as determined under section 661 of Title 49, CFR).
-
A declaration, applicable to the statement and any accompanying documents, signed by you, or signed by a person currently authorized to bind you in such matters, in the following form: “Under penalties of perjury, I declare that I have examined the information contained in this Domestic Content Certification Statement and to the best of my knowledge and belief, it is true, correct, and complete.”
See Domestic Content Bonus Credit Amount and Notice 2023-38, available at IRS.gov/irb/2023-22_IRB#NOT-2023-38, for guidance with respect to the domestic content requirement.
Part II—Clean Electricity Production
Line 1 and Line 2
Enter the kilowatt hours of qualified clean electricity produced at the applicable qualified facilities and multiply by the applicable rate. Enter the calendar year related to the kWh on line 1 or line 2.
Base amount.
Multiply the base amount of 0.3 cents by the inflation adjustment factor for the calendar year in which the sale, consumption, or storage of the electricity occurs. If this is not a multiple of 0.05 cent, round to the nearest multiple of 0.05 cent. Enter this amount in column (b) that corresponds to the calendar year entered on line 1 or line 2.
Alternative amount.
Multiply the alternative amount of 1.5 cents by the inflation adjustment factor for the calendar year in which the sale, consumption, or storage of the electricity occurs. If this is not a multiple of 0.1 cent, round to the nearest multiple of 0.1 cent. Enter this amount in column (b) that corresponds to the calendar year entered on line 1 or line 2.
A qualified facility would use the base amount or alternative amount, as applicable; it would not use both amounts in a single calculation.
Skip lines 1 through 9 if you are only claiming a credit that was allocated to you from a partnership, S corporation, estate, trust, or cooperative.
Line 5a
Energy community bonus.
If you checked “Yes” on Part I, line 8, multiply the amount on Part II, line 5a, by 10% (0.10). See Increased Credit in Energy Communities , earlier.
Line 9
Elective payment phaseout for applicable entities.
If you are making an elective payment election for a facility whose construction began in calendar year 2024, and the facility does not satisfy the rules of section 45Y(g)(12)(B)(i) or does not have a maximum net output of less than 1 megawatt (as measured in alternating current), multiply line 9 by 90% (0.90).
Exception to elective payment phaseout.
For facilities whose construction begins before the later of calendar year 2024 or further guidance, Notice 2024-09 provides transitional procedures to claim the statutory exceptions to the elective payment phaseout related to the domestic content requirement.
To substantiate your claim of exception to the elective payment phaseout, you must complete and attach a statement to Form 7211. The statement must say, under penalties of perjury, that you have reviewed the requirements for the increased cost exception and the non-availability exception under section 45Y(g)(12)(D), and have made a good-faith determination that the qualified facility meets the requirements for the increased cost exception and/or the non-availability exception, as applicable. The statement must be signed by a person with the legal authority to bind the applicable entity in federal tax matters. For more information, see Notice 2024-09 and Notice 2024-84, available at IRS.gov/irb/2024-50_IRB#NOT-2024-84.
Line 10
On a separate Form 7211, enter “Credits From Pass-Through Entities” on line 2a of Part I and report your total distributive share from:
-
Schedule K-1 (Form 1065), Partner’s Share of Income, Deductions, Credits, etc., box 15 (code W);
-
Schedule K-1 (Form 1120-S), Shareholder’s Share of Income, Deductions, Credits, etc., box 13 (code W);
-
Schedule K-1 (Form 1041), Beneficiary’s Share of Income, Deductions, Credits, etc., box 13 (code E); and
-
Form 1099-PATR, Taxable Distributions Received From Cooperatives, box 12.
Partnerships and S corporations must enter the passed-through credits on line 10. Also, estates and trusts that can allocate the source credit to beneficiaries, and cooperatives that can allocate the credit to patrons, must enter the passed-through credits on line 10.
If you are not a filer described above, and your only clean electricity production credit is credits passed through to you, you can report the credits directly on Form 3800, Part III, line 1gg, as applicable.
Line 11
Partnerships and S corporations. If you are a(n) partnership or S corporation electing to transfer the energy credit with respect to a facility or property (or portion thereof) under section 6418(c), you must report the total credit amount with respect to your facility on Form 3800, Part III, line 1gg, and not on Schedule K.
Line 12
Cooperative election to allocate credit to patrons.
A cooperative described in section 1381(a) that is more than 50% owned by agricultural producers or by entities owned by agricultural producers can elect to allocate any part of the credit among the patrons of the cooperative. The credit is allocated among the patrons eligible to share in patronage dividends on the basis of the quantity or value of business done with or for such patrons for the tax year.
The cooperative is deemed to have made the election by completing line 12, as applicable. However, the election isn't effective unless (a) made on a timely filed return (including extensions), and (b) the organization designates the apportionment in a written notice mailed to its patrons during the payment period described in section 1382(d) or on Form 1099-PATR.
If you timely file your return without making an election, you can still make the election by filing an amended return within 6 months of the due date of the return (excluding extensions). Enter “Filed pursuant to section 301.9100-2” on the amended return.
Once made, the election can’t be revoked.
Estates and trusts.
Allocate the credit on line 11 between the estate or trust and the beneficiaries in the same proportion as income was allocated and enter the beneficiaries’ share on line 12.
We ask for you to obtain the information on this form to carry out the Internal Revenue laws of the United States. You are required to obtain this information. You are not required to obtain the information requested on a form that is subject to the Paperwork Reduction Act unless the form displays a valid OMB control number. Books or records relating to a form or its instructions must be retained as long as their contents may become material in the administration of any Internal Revenue law. Generally, tax returns and return information are confidential, as required by Internal Revenue Code section 6103. The time needed to complete and file this form will vary depending on individual circumstances. The estimated burden for individual filers is approved under OMB control number 1545-0074; for tax exempt filers, under OMB control number 1545-0047; for business filers, under OMB control number 1545-0123; and for trust filers, under OMB control number 1545-0092. For the estimated averages, see the instructions for your income tax return. If you have comments concerning the accuracy of these time estimates or suggestions for making this form simpler, we would be happy to hear from you. See the instructions for the tax return with which this form is filed.