3.30.19 Production Control and Performance Reporting3.30.19.1 IMPIS Overview3.30.19.1.1 Abbreviations and Acronyms3.30.19.2 Work Planning and Control (WP&C)3.30.19.2.1 Management Tools3.30.19.2.2 Key Elements of the Management Tools3.30.19.2.3 Work Plans3.30.19.2.4 Work Schedules3.30.19.2.5 Performance and Cost Data Transmission3.30.19.2.6 Performance and Cost Reports3.30.19.2.6.1 WP&C Reports3.30.19.2.6.2 Managers Report 3.30.19.2.6.3 Program Analysis Report3.30.19.2.6.4 Abstract Report3.30.19.2.6.4.1 Employee Category Record3.30.19.2.6.5 Performance Adjustments3.30.19.2.6.6 Employee Detail Summary Report3.30.19.2.6.7 Employee Detail Adjustments3.30.19.2.6.7.1 Production and Performance Adjustments Listing3.30.19.2.6.7.2 Managers Report Performance and Cost Control Record3.30.19.2.6.7.3 Selected Master Data File Fast Print Control Record3.30.19.2.6.7.4 OFP Consistency File and Checks3.30.19.2.6.7.5 Project PCA and Work Schedule Inputs/Inputs from Project PCA3.30.19.2.6.7.6 Work Schedule Inputs3.30.19.2.7 Quarter, Annual, and Basic Cut Over Procedures3.30.19.2.7.1 Midweek Quarter Ending Reports3.30.19.2.7.2 End of Year Adjustments3.30.19.2.7.3 Service Center Master File POF List3.30.19.3 Validation of Data3.30.19.3.1 Error Registers and Codes/Preliminary and Correction Error Registers3.30.19.3.2 Daily Adjustment Error Listing3.30.19.4 Tape and Report Shipments3.30.19.5 Service Center Production Control3.30.19.5.1 Batch/Block Tracking System3.30.19.5.2 Production Reporting/Batch and Production Control Records3.30.19.5.3 Pipeline Receipts3.30.19.5.4 Pipeline Production Reporting3.30.19.5.5 Rollback Procedures3.30.19.5.6 Unit Production Records3.30.19.5.7 Inputs from Control Data Analysis3.30.19.5.8 System Output3.30.19.5.9 Daily Production Report3.30.19.5.9.1 Daily Production Report Control Records3.30.19.5.9.2 Balancing the DPR3.30.19.5.9.3 DPR Production Adjustments3.30.19.5.9.4 Sample Manual Adjustments3.30.19.5.9.5 Date Records3.30.19.5.9.6 Daily Date Records3.30.19.5.9.7 Weekly Date Records3.30.19.5.10 Batch Profile Report3.30.19.5.11 Batch Profile Production Adjustments3.30.19.6 Individual Performance3.30.19.6.1 Scope3.30.19.6.2 Related IRMs3.30.19.6.3 Output Provided3.30.19.7 Obsolete Incentive Pay Program3.30.19.8 Work Planning and Control (WP&C) System, Organization, Function and Program (OFP) Code List3.30.19.9 Reconciliation of Payroll and Performance and Cost ReportExhibit 3.30.19-1 Organization, Function and Program CodeExhibit 3.30.19-2 Broad Program SummariesExhibit 3.30.19-3 Daily Workload and Staff-hours Schedule Report (PCB-04-40)Exhibit 3.30.19-4 Weekly Workload and Staff-hours Schedule Report (PCB-05-40)Exhibit 3.30.19-5 Managers Reports (PCC-60-40, PCC-62-40, PCC-46-40)Exhibit 3.30.19-6 Batch Profile Report (PCC-32-40)Exhibit 3.30.19-7 Daily Production Report Organization Sequence (PCC-24-40)Exhibit 3.30.19-8 Daily Production Report Program Sequence (PCC-22-40)Exhibit 3.30.19-9 Guide for Adjusting DPR from Changes Written on Control Data Analysis Report (PCD 565)Exhibit 3.30.19-10 Employee Detail Summary (PCC-42-40)Exhibit 3.30.19-11 Error MessagesExhibit 3.30.19-12 Batch and Production Control Record LayoutExhibit 3.30.19-13 Unit Production Record LayoutExhibit 3.30.19-14 Production Adjustments Record LayoutExhibit 3.30.19-15 Abstract Adjustments Record Layout Part 3. Submission ProcessingChapter 30. Work Planning and ControlSection 19. Production Control and Performance Reporting 3.30.19 Production Control and Performance Reporting Manual Transmittal January 12, 2017 Purpose (1) This transmits revised Internal Revenue Manual (IRM) 3.30.19, Work Planning and Control (WP&C), Production Control and Performance Reporting. Background This IRM provides an overview of Project PCC Production Control and Performance Reporting, procedures for reviewing and monitoring input from Project PCA and BBTS. It also provides procedures for adjustment of Project PCC output data and the update of the Organization, Function, and Program (OFP) Consistency File. Integrated Management Planning and Information System (IMPIS) Work Planning and Control (WP&C) currently contains 4 projects, Project PCA, Project PCB, Project PCC, and Project PCD. Material Changes (1) Editorial changes have been made throughout the IRM. (2) An instruction regarding deviation from IRM procedure was added in IRM 3.30.19.1(7). (3) A reference regarding protection of Personally Identifiable Information (PII) was added in IRM 3.30.19.1(8). (4) The following sections and sub-sections were changed to direct the User to the WP&C Reports Team for processing of the adjustment or record change. IRM 3.30.19.2.6.5 Performance Adjustments IRM 3.30.19.2.6.7 Employee Detail Adjustments IRM 3.30.19.2.6.7.2 Managers Report Performance and Cost Control Record IRM 3.30.19.2.6.7.3 Selected Master Data Fast Print Control Record IRM 3.30.19.2.6.7.4 OFP Consistency File and Checks IRM 3.30.19.5.9.2 Balancing the DPR Effect on Other DocumentsThis material supersedes IRM 03.30.19 dated March 26, 2014. AudienceBusiness Operating Divisions within the IRS that report to and use Work Planning and Control (WP&C). Effective Date(01-12-2017)Linda J. BrownDirector, Submission ProcessingWage and Investment Division 3.30.19.1 (01-12-2017) IMPIS Overview The following organizations utilize the Integrated Management Planning and Information System (IMPIS) for workload and resource reporting: Wage and Investment Division (W&I) Customer Account Services (CAS) Campuses (Andover Campus (ANSC), Atlanta Campus (ATSC), Austin Campus (AUSC), Brookhaven Campus (BSC), Cincinnati Campus (CSC), Fresno Campus (FSC), Kansas City Campus (KCSC), Memphis Campus (MSC), Ogden Campus (OSC), Philadelphia Campus (PSC)) Small Business/Self Employed (SB/SE) Field Compliance Services Campuses (ANSC, ATSC, BSC, CSC, FSC, KCSC, MSC, OSC, PSC) W&I Identity Theft Victims Assistance (IDTVA) Taxpayer Advocate Service (TAS) Human Capital Office (HCO) Currency Transaction Reporting Operation Payroll/Personnel Systems Agency Wide Shared Services (AWSS) / Strategic Human Resources W&I Customer Assistance, Relationships and Education (CARE), Stakeholder Partnerships, Education and Communication (SPEC) Tax Exempt and Government Entities (TEGE) Learning and Education (L&E) Correspondence Production Service (CPS) Online Services (OLS) Return Preparer Office (RPO) Electronic Products and Services Support (EPSS) Information Technology (IT) Stakeholder Liaison National Distribution Center (NDC) Statistics of Income Operation (SOI) IMPIS provides methods and management tools for evaluation of the workload and resources for: Planning Scheduling Controlling Measuring IMPIS allows management to view information for the organizations that utilize IMPIS in a common framework and simplifies the tasks of: Developing and evaluating work plans, Developing budgets, Allocating staff-power Determining status of workload and resources, and Appraising performance. The system encompasses separate component systems named: Project Literal for Project PCA Production Control Accounting (PCA) (obsoleted Performance Evaluation Reporting System (PERS)) Project Literal for Service Center Workload Scheduling (PCB) Project Literal for Service Center Production Control (PCC) Project Literal for Control Data Analysis (PCD) Project Literal for Individual Review (PCE) (obsoleted 10/01/2013) Each of these component systems are separate and have a different primary objective. However, there are certain elements of data in one system that directly relates to the other systems; therefore, the same information is used to satisfy the needs of all systems. This is done when it is practical and there is no danger of defeating the primary objective of each system. Staff-hours reported for Individual Performance are used in Performance and Cost Reports. Volumes used for certain Production Reports are also used for Performance and Cost Reports. The following IRMs contain specific requirements and instructions for each of the component systems mentioned above and for the Reports Team that processes correction data and maintains the system: IRM 3.30.18, Reports Teams Instructions for Work Planning and Control, IRM 3.30.20, Organization, Function, and Program (OFP) Codes, IRM 3.30.28, Individual Review (Obsolete 10/01/2013), IRM 3.30.50, Project PCA Production Control Accounting, IRM 3.30.126, Control Data Analysis, and IRM 3.30.127, Workload Scheduling. IRM deviations must be submitted in writing following instructions from IRM 1.11.2.2., Internal Management Documents System - Internal Revenue Manual (IRM) Process, IRM Standards, and elevated through appropriate channels for executive approval. It is the responsibility of the user of information from this system to protect Personally Identifiable Information (PII) from unauthorized use, access, disclosure or sharing IRM 10.5.1, Privacy Information Protection and Data Security Policy and Guidance. 3.30.19.1.1 (03-26-2014) Abbreviations and Acronyms Below is a list of abbreviations and acronyms that will be referenced throughout the rest of this section: Abbreviation / Acronym Definition ADP Automatic Data Processing Adj. Adjustment ANSC Andover Campus ATSC Atlanta Campus AUSC Austin Campus AWSS Agency Wide Shared Services BBTS Batch/Block Tracking System BMF Business Master File BMFOL Business Master File On-Line BOB Block Out of Balance BOD Business Operating Division BPC Batch and Production Control BPR Batch Profile Report BSC Brookhaven Campus CARE Customer Assistance, Relationship and Education CAS Customer Account Services CFO Chief Financial Office CPS Correspondence Production Service CSC Cincinnati Campus Cum Cumulative DCC Detroit Computing Center DLN Document Locator Number DPR Daily Production Report ECC Enterprise Computing Center EFF Efficiency Emp Employee EONS Electronic Output Network System EPSS Electronic Products and Services Support FSC Fresno Campus Func Function FY Fiscal Year GMF Generalized Mainline Framework HCO Human Capital Office Hrs Hours IDRS Integrated Data Retrieval System IFS Integrated Financial Systems IMF Individual Master File IMPIS Integrated Management and Planning Information System IP Individual Performance IPS Incentive Pay System ISRP Integrated Submission and Remittance Processing IRM Internal Revenue Manual IT Information Technology KCSC Kansas City Campus KV Key Verification L&E Learning and Education MEM Memphis MEPS Measured Employees Performance System MF Master File MIS Management Information Systems MSC Memphis Campus MTB Martinsburg NDC National Distribution Center NMF Non-Master File OE Original Entry OF Organization Function OFP Organization Function Program OLS Online Services Org Organization OSC Ogden Campus O/T Overtime OTF/T {C/C} Other than Full/Time {Career/Conditional} P&C Performance and Cost PCA Project Literal for Production and Control Accounting, Project Literal for Performance Evaluation Reporting System (PERS), Project PCA (551) PCB Project Literal for Service Center Workload Scheduling, Project PCB (562) PCC Project Literal for Service Center Production Control and Performance Reporting, Project PCC (563) PCD Project Literal for Control Data Analysis, Project PCD (565) PCE Project Literal for Individual Review (Obsolete 10/01/2013) Per Period PERF Performance Perm Permanent PERS Performance Evaluation Reporting System PIMS Pipeline Inventory Monitoring System POF Program Organization Function PSC Philadelphia Campus Qtr Quarter Reg Regular RPO Return Preparer Office SB/SE Small Business/Self-Employed Division S/H Staff Hour SC Service Center SCHED Scheduled SCRIPS Service Center Recognition/Image Processing System SCRS Service Center Replacement System SETR Single Entry Time Reporting SOI Statistics of Income Operation SPEC Stakeholder Partnerships, Education and Communication STAND Standard STRAWS Suite of Tools for the Review and Creation of Automated Workplans and Schedules TAS Taxpayer Advocate Service Temp Temporary TEPS Total Evaluation Performance System UPC Unit Production Record VAR Variance VOL Volume W&I Wage and Investment Division WAE When Actually Employed WP&C Work Planning and Control 3.30.19.2 (03-26-2014) Work Planning and Control (WP&C) The system is designed to relate workload to staff-power. It is organized to provide management tools for the various management levels. These tools provide the means for: Determining staff-power needs, Preparing of plans to justify staff-power needs, Distributing workload and staff-power within the time span limitations of deadlines and target dates, Appraising performance, Determining status of actual workload accomplished and staff-hours expended related to the plan. The system will detect and highlight problem areas for management and provide some basic analyses with regard to current and future conditions. It is designed to assist management. Staff-hour data provided by the management tools of this system (Work Plans, Work Schedules, and Performance and Cost Reports) are to be directly related to the operating Financial Plan. The data will be used as the basis for projections in the Financial Plan, and a comparison will be made of budgeted staff-hours with actual expenditures to reflect true financial conditions. WP&C is one of the major component systems contained within IMPIS. It is not designed for daily production control or individual performance evaluation. 3.30.19.2.1 (03-26-2014) Management Tools Business operating divisions (BOD) require long range estimates or forecasts of workload and staff-power to obtain financial support, short range refinement of these forecasts to distribute resources allocated, and quantitative measurement of work accomplished. The WP&C system provides the following management tools to satisfy these needs: Work Plans — to indicate what work will be done, to determine the resources required to accomplish the work, and provide a basis for the Financial Plan. Work Schedules — to indicate when work projected in the Work Plan will be accomplished, to provide a basis for accession of employees by skills, and provide a basis for periodically analyzing the actual status of work compared to that which has been scheduled. Performance Reports — to reflect actual workload accomplished and resources expended in relation to the schedule. The BODs use the various Performance and Cost Reports to budget, monitor and evaluate campus operations. The information provided in these reports serves as a base in: Planning future resource requirements Analyzing workload scheduling Extrapolating major program costs Tracking resource expenditures against planned funding 3.30.19.2.2 (03-26-2014) Key Elements of the Management Tools The management tools outlined in IRM 3.30.19.2.1, Management Tools, above, are comprised of the following elements: A uniform OFP list showing where the work is done, the work actions necessary to the performance of the work and the work program requiring the actions. Work units that reflect work accomplished in relation to the staff-hours expended. Standards of production that establish each measured project, how much output (in terms of work units) can reasonably be expended. Input records that record work accomplished and effort expended. 3.30.19.2.3 (03-26-2014) Work Plans The WP&C provides a method for coordinating the combined expertise of the site specific staff and the BOD into a plan of action based on past performance and governed by factors that will influence the course of the individual campus in a specific fiscal year. The plan of action provided by this system is known as the Work Plan. The Plan originates with computer generated performance data which is updated by the Wage and Investment, Customer Account Services, Submission Processing, Program Management/Process Assurance, Resource Section (SE:W:CAS:SP:PM:R) and is forwarded to the campuses and BOD for review. All changes made to the Work Plan, as well as the supporting narrative statements, are maintained in Suite of Tools for the Review and Creation of Automated Work Plans and Schedules (STRAWS). The campus and BOD offices review the work plans to ensure their adequacy. This review will be facilitated by the use of computer produced comparison listings. The comparison basis will be the prior calendar year’s performance data. Personnel at individual campuses enter proposed changes into STRAWS. Each OFP combination adjusted includes a narrative statement containing the reason(s) for decreases/increases. Narratives should be clear and concise, explaining the reason(s) for the proposed adjustment. If the proposal is to move volume and/or staff hours from one OFP to another, both the "from" and the "to" OFP should identify the offset. The automated system provides an audit trail for each OFP from the start of the Work Plan process to the "Final" Work Plan phase. During and after the Work Plan process, all users can review the changes made to an OFP, as well as the narratives that support these changes. Work Plans form the basis for Financial Plans. The staff hour requirements developed in the Work Plan represent the labor or staff year portion of the Financial Plan. Headquarters Submission Processing, Program Management/Process Assurance, Resource Section personnel are responsible for the oversight of STRAWS, each Business Operation Division is responsible for the processing of Work Plan data. Each functional user or Business Unit is responsible for: Meeting the timeliness established by Submission Processing, Coordinating the review of their functional or Business Unit Work Plans, Analyzing all proposed adjustments, Issuing counter proposals to their field personnel or Business Unit entities, and Conducting joint conferences with their functional or Business Unit entities to reach an "Agreed" or "Final" Work Plan. These figures are entered into the database once an agreement is made. Any open issues are finalized by an administrative decision made at the BOD level. The final Work Plan staff hour information is furnished to personnel who translate the staff hours/years into labor costs. Therefore, all parties involved in the Work Plan process are responsible for ensuring the availability of staffing and dollar costs needed to operate programs. Each Functional user or Business Unit at the National level issues Work Plan approval memorandums for their offices (usually in Late-August). These documents provide the approved Work Plan staff years as well as the approved Financial Plan availability for a specific fiscal year by budget allocation office/entity. If the approved Work Plan figures differ from the Financial Plan figure, the memorandum includes instructions or recommendations on what adjustment(s) should be made in scheduling and/or execution. The memorandum may also include high level program guidance on key programs. Situations which require adjustments to the operating Financial Plan, e.g., subsequent Congressional actions, are relayed to the field with appropriate instructions by BOD. 3.30.19.2.4 (03-26-2014) Work Schedules Work Schedules provided by this system will be generated by computer programs. These programs and the procedures for preparation of the necessary input documents are provided in IRM 3.30.127, Workload Scheduling. Campuses will schedule work three times per year which will result in three final outputs: Schedule Analysis Tape (PCB 9011) to be used in scheduling review; transmitted to DCC for related operations; and to generate an input cartridge for Project PCC (Service Center Production Control and Performance Reporting). PCB 9013 is input to PCB 93 which creates Disk file PCC 0101. A cumulative Workload and Staff-hour file to be used by Business Operating Divisions. The scheduling system will be used to generate scheduling outputs for: The first quarter of the Fiscal Year (October – December), The Individual Master File (IMF) filing period (January – June), The last quarter of the Fiscal Year (July – September). Approximate due dates for receipt of scheduling outputs are maintained by the BOD. See Exhibit 3.30.19-3 and Exhibit 3.30.19-4 for copies of the PCB 0440 and PCB 0540 workload and staff-hour schedules. Work schedules indicate when work projected in the Work Plan will be accomplished. The schedules are a more comprehensive representation of approved Work Plans. After Work Plans have been prepared, reviewed, and agreed to, they may be adjusted by program cuts of efficiency/productivity assessments. These adjusted work plans will be the basis for the recommended Financial Plan. The Business Operating Divisions will base their schedules on the approved Work Plan. The computer programs for producing the schedules call for a master tape (Project PCB, Run 90) that will subsequently be related to the Performance and Cost Reports. On a quarterly basis, management should ensure that the scheduled hours fit within the framework of the Operating Financial Plan. This enables management to determine their position in relation to the funded Work Plan and to make necessary decisions in the event of variances. When all Work Schedule data has been transmitted to the Detroit Computing Center (DCC), they are used in a series of computer programs which compare work schedule data to the most recent comparable quarter or half-year performance data. The listings are produced to coincide with, and as a tool in, the Work Schedule review process. All files produced on File PCB 9011 representing the original work schedules, and the final revised Work Schedules will be transmitted to DCC. (See IRM 3.30.123, Processing Timeliness: Cycles, Criteria, and Critical Dates). Labels and transmittals will identify the DCC project designation (ZNV–PCB 9011) and the appropriate "DCC Data Cycle" from IRM 3.30.123, Processing Timeliness: Cycles, Criteria, and Critical Dates. 3.30.19.2.5 (03-26-2014) Performance and Cost Data Transmission The BOD will continue to receive copies of all Performance and Cost Reports, as described in IRM 3.30.19.2.5, Performance and Cost Data Transmission. The weekly Performance and Cost data out of PCC 70 (Files PCC 7003 and 7004), will be transmitted by the Computing Centers (ECC-MEM/ECC-MTB) to DCC. In addition to the usual label information on the retention period and cycle of production, the legend "Week Ending," and the report date of data, must be recorded. The transmission of WP&C data for the periods ending June 30, September 30 and December 31 should reflect all adjustments to receipt volumes required to produce final report figures for the Quarterly or Semi-Annual Period. If the period ending date does not fall on a Friday, Saturday or Sunday, a special period ending run for that complete period must be created and transmitted. The final label for January-June, July-September, and October-December will contain the legend "Quarter Ending," and the report date. The labels and transmittals are to identify the DCC project designation ("ZNK" ) and the appropriate DCC Data Cycle from IRM 3.30.123, Processing Timeliness: Cycles, Criteria, and Critical Dates. The purpose of weekly transmissions to DCC is to produce edited input to the data base system maintained by the BOD. This will reduce transmission of monthly data from campuses to the BOD. In addition to its use as a base, performance data provides the base file for print outs known collectively as the "Blue Book." This series of computer output includes three levels of Staff-hour analysis (campus, operation, department), three levels of overhead program analysis, a function-total listing, an organization detail listing, and a program detail listing. Blue Books are produced for both the fiscal and calendar year and the IMF filing period (January — June). Also, quarterly data is used to create calendar year and fiscal year OFP Analysis Reports, equivalent to the weekly OFP reports. These reports contain volumes, hours, and rates for the entire year in OFP sequence for each campus and a National total. For specific instructions, contact organization SE:W:CAS:SP:PMPA:R (Resource Section). Guidelines for the Performance and Cost data transmission to DCC and the Enterprise Computing Centers are specified in IRM 3.30.123, Processing Timeliness: Cycles, Criteria, and Critical Dates), 3.30.19.2.6 (03-26-2014) Performance and Cost Reports These computer generated reports enable management to evaluate performance in relation to the schedule for the campus site as a whole, for each operation and for any program within a function. Information as to future needs is projected in relation to current actual production. Time reporting procedures are found in IRM 3.30.50, Project PCA Production Control Accounting. 3.30.19.2.6.1 (03-26-2014) WP&C Reports Four weekly WP&C Reports are produced by the system. Two of these, the Managers Report and the Program Analysis Report, use weekly schedule data from the workload scheduling system, performance data from the Project PCA, and production data from the Daymast File as inputs. Since the Daymast is updated daily and these reports are often not produced until the next week, users should be careful to use the proper Daymast file for these reports. The other two reports, the Abstract Report and the Employee Detail Summary, provide fiscal information on employees by organization. Data for these reports comes from Project PCA. 3.30.19.2.6.2 (03-26-2014) Managers Report The Managers Report (PCC-60-40) is a weekly report designed to provide site managers with an evaluative tool to manage their operations. The report compares scheduled or projected data with actual production. The report is also used in the work planning/scheduling process. See Exhibit 3.30.19-5 for a sample and description of the Managers Report. This report is also used by BOD managers and analysts to monitor various operations and/or programs within their purview. This report consists of two major sections, Performance and Evaluation. The Performance part of the report is generated from the approved Work Schedule, various volume reports (including Unit Production Records), and actual staff hours taken from the Employee Time Report, Form 3081. The Evaluation part of the report provides analysis of the performance data in the first part of the report. It pinpoints and analyzes the differences and gives an indication of what the results will be if current conditions prevail. The report is printed in OFP sequence. It shows the first two positions of the five digit Organization code (XX000), the first two positions of the three digit Function Code (NN0), and the five digit Program Code (NNNNN) — the first four positions are specified in Document 5995A via link located on the OFP Code Web Site at http://etd.ds.irsnet.gov/etd/ofp and the fifth digit is designated by local management. Each OFP combination that has hours scheduled and/or reported during the covered period is shown on the report. Cumulative data covers the six month period January-June, and the three month report periods July-September and October-December. This report generally covers a one week period, running from Sunday through Saturday. When the periods ending June 30, September 30 and December 31 fall on any day other than Friday, Saturday or Sunday two reports will be produced for that week — one from Sunday through the quarter ending date, the second from the next day through Saturday. The Enterprise Computing Center will ensure that the report is electronically available by Wednesday of the week following the close of the reporting period. In addition, Enterprise Computing Centers will transmit a copy of each campus’ report to the Control-D Web server and Business Objects. If for any reason reports are not transmitted by the designated date, the appropriate Enterprise Computing Center (ECC-MTB/ECC-MEM) should contact the WP&C Coordinator, Quality Section in Submission Processing (SE:W:CAS:SP:PM:Q) immediately and give a status of the problem. Control D and Business Objects provides to the Business Operating Divisions access to WP&C/Managers, Program Analysis, Abstract, Employee Detail, and OFP Analysis Reports via personal computers. Electronic transmission of these reports have eliminated the administrative burden of printing and mailing paper copies. Six reports are transmitted weekly including the Managers Report (PCC-60-40) the Program Analysis Report (PCC-62-40) the Abstract Report (PCC-46-40), and campus extracts (PCC 46), (PCA 07), and (PCC 60W/Q). The performance section is generated from the approved work schedule, various volume reports, and the actual staff hours taken from Form 3081, Employee Time Report. The evaluation section provides analysis of the performance data in the first part of the report. This section pinpoints and analyzes the differences between the scheduled rate and hours, and the actual rate and hours. It also gives an indication of what the results will be if current conditions continue. The analysis of this information may be used to determine whether to alter existing conditions in order to change future results. An asterisk (*) printed next to a cumulative figure indicates that the figure has been adjusted for the week. The report is printed in OFP sequence. Reporting begins with the first two positions of Organization Code (e.g., 34000), the first two positions of Function Code and all five positions of Program Code. Summaries of overhead programs, Operation and Department totals are provided in a special section at the end of the report. An OFP must have actual hours or scheduled hours reported before it will print on the Managers Report. Production volumes reported in the WP&C system without actual or scheduled hours are excluded in the Managers Report. See Exhibit 3.30.19-5. Program number 00000 can be used as a Function Summary for all volumes reported to OFPs in the function which do not have hours reported (i.e., 31000–110–00000 or 31000–180–00000). IRM 3.30.19.2.6.7.2(1) - (5) for more information on creating summary records using Performance and Cost Control Record (PCC-60-81). Hours from programs in 598XX series are excluded from operation and campus totals. 3.30.19.2.6.3 (03-26-2014) Program Analysis Report The Program Analysis Report (PCC-62-40) is a weekly report which provides managers with an evaluative tool to manage their operations. It contains basically the same data elements as the Managers Report but differs in that it is printed in POF sequence. See Exhibit 3.30.19-5 for a sample of the Program Analysis Report. The report reflects all volume and staff-hour data that is reported in IMPIS. Volumes that are reported for production control purposes but suppressed in other Performance and Cost Reports will be reflected in the Program Analysis Report. For certain Program Codes a volume count may be shown without the corresponding staff-hours. In these cases the staff-hours and volume counts were reported at a higher summary level. Quarterly and semi-annual reports will include data through the last day of the quarter or semi-annual period. These quarter or semi-annual reports will end on September 30, December 31, and June 30. When these dates fall on any day other than Friday, Saturday or Sunday, two reports will be produced for that quarter — one running from Sunday through the last day of the planning period and one running from the next day through the last day of the next planning period. Distribution of the Program Analysis Report is identical to that for the Managers Report. (See IRM 3.30.19.2.6.2.(8) and IRM 3.30.19.2.6.2.(9)) Columns and calculations for the Program Analysis Report are the same as for the Managers Report. An asterisk (*) printed next to a cumulative figure indicates that the figure has been adjusted for the week. Summaries are provided by the four high order digits of program code. Program summaries of scheduled and actual production, standards and rates include the numbers taken from the function designated as the point of count. The summaries for all other columns include all the details for the program. If no function has been designated as the point of count, the volume field will be left blank. A one line Service Center Total appears at the end of the report. OFPs with volume reported but no actual or scheduled hours are included in the Program Analysis report. At the end of each program is a campus summary (20000/3Z000, A0000/FZ000) as well as the total campus’ program summary (10000–FZ000). All summaries are by program code. 3.30.19.2.6.4 (03-26-2014) Abstract Report The Abstract Report (PCC-46-40) is a weekly report used to track hours and costs by fiscal activity and employment category. It is also used in preparing the Reconciliation of Payroll and Performance Cost Report, Form 5462. See Exhibit 3.30.19-5. for a sample and description of the Abstract Report. A separate page is printed for each employment category, within each operation with summary pages by funding code and a total organization summary. Period and cumulative information is provided by operation for each week of the quarter. Four reports are printed for each operation: Permanent Employment Category — Hours and cost for all permanent employees within a program activity. OTF/T {C/C} Employment Category — Hours and cost of all seasonal employees within a program activity. Program Activity Summary — Total of the Permanent and OTF/T {C/C} Employment Category hours within a program activity. For example, in Exhibit 3.30.19-5 for the week ending 04-04, the permanent hours of 849 added to the OTF/T {C/C} hours of 6,282 equals the total hours of 7,131 for Program Activity 2B. Branch Summary — Total hours in the operation/department. This includes all program activities within an operation/department. Other pages may be included at the campus' option by using the Temporary Category Code. This code can be used to obtain a more detailed breakdown of the above categories. For example, the Temporary Career/Career-Conditional Category could be separated by new and returning WAE/Seasonal employees. Each Employment Category is printed on a separate page with summary pages by Funding Code and a Total Organization Summary. Each page includes from 1 to 14 weeks data (week by week). Cumulative data is kept for the quarter, except for April–June when cumulative figures also include the January–March figures. The total line for period data equals the total of all period lines. This may be different from the cumulative total because adjustments will only correct cumulative data. The period total line for April to June includes the January–March data. This line does not print if only one week’s data is present. Memorandum items (Compensatory Leave, Night Differential, Sunday Premium, and SC Details In) are not added in the totals. Distribution of the Abstract Report is identical to that for the Managers and Program Analysis Reports. (See IRM 3.30.19.2.6.2.(8) and IRM 3.30.19.2.6.2.(9)). 3.30.19.2.6.4.1 (03-26-2014) Employee Category Record The Employee Category Record (PCC-46-80) is used to put titles for employment categories (Funding Code and Temporary Category Code) on the Abstract Report. Key the Employee Category Record as follows: Record Position Input 1 Funding Code (0, 1, or 2) 2 Temporary Category Code (0-9 or blank) 4–16 Employment Category Title The Funding Codes are: 0 = Permanent, 1 = Other than Full-Time Permanent (Career/Career Conditional), and 2 = Other than Full-Time Permanent (Non Career/Career Conditional). The Temporary Category code can be used for further breakdown of the Funding Code. Codes 1 through 9 define further breakdowns; codes 0 or blank indicate no further breakdown. 3.30.19.2.6.5 (01-12-2017) Performance Adjustments Performance adjustments can be annotated on Form 4464, Daily Performance Adjustments Log or Form 8069, SCRS Managers Performance Adjustments Log, and then sent to the servicing WP&C Reports Team for processing. Performance Adjustment Records are used to adjust hour and cost data on the Abstract and Managers Reports. A managers performance adjustment with a program activity code will adjust the total basic hours and/or basic cost fields on the Abstract Report. If the program activity code is not present, the Abstract Report will not be adjusted. Two records are used to adjust data on the Abstract Report. These records are independent, the presence of one does not require the presence of the other. Fields on the first Abstract Performance Adjustment Record used to adjust Night Differential Hours/Costs, Sunday Premium Hours/Costs and Basic Hours/Costs (Control Code = 1) include: Record Position Description 1 Record Code — Always "2" 2 Adjustment Code (2, 3, 4, or 9) — see IRM 3.30.19.5.9.3(4) 3–4 Employee Type Code — leave blank unless a detail from outside the campus. 5 Control Code = "1" 6 Funding Code (0, 1, or 2) — see IRM 3.30.19.2.6.4.1(3) 7 Temporary Category code (0-9) — see IRM 3.30.19.2.6.4.1(4) 8–12 Organization Worked — Required 13 Overhead Indicator (9 or blank) 21–26 Week Ended — Required (MMDDYYYY) 27–28 Program Activity Worked — Required 29–30 Assigned Program Activity. Input if different from Program Activity Worked — Otherwise leave blank 34–38 Night Differential Hours — Whole Numbers 39–44 Night Differential Costs — Whole Dollars 45–49 Sunday Premium Hours — Whole Numbers 50–55 Sunday Premium Costs — Whole Dollars 62–69 Basic Hours — Whole Numbers 70–80 Basic Costs — Whole Dollars All positions not specified are left blank. Note: Form 4464, Daily Performance Adjustments Log — Adjust Abstract Report Only. Fields on the second Abstract Performance Adjustment Record used to adjust Compensatory Leave Hours/Costs, Paid Overtime Hours/Costs and Unpaid Overtime Hours/Costs (Control code = 2) include: Record Position Description 1 Record Code — Always "2" 2 Adjustment Code (2, 3, 4, or 9) — see IRM 3.30.19.5.9.3(4) 3–4 Employee Type Code — leave blank unless a detail from outside the center 5 Control Code = "2" 6 Funding Code (0, 1, or 2) — see IRM 3.30.19.2.6.4.1(3) 7 Temporary Category Code (0–9) — see IRM 3.30.19.2.6.4.1(4) 8–12 Organization Worked — Required 13 Overhead Indicator (9 or blank) 21–24 Week Ended — Required (MMDD) 25–26 Program Activity Worked — Required 27–28 Assigned Program Activity. Enter if different from Program Activity worked — Otherwise leave blank 34–38 Compensatory Leave Hours — Whole Numbers 39–44 Compensatory Leave Costs — Whole Dollars 45–49 Paid Overtime Hours — Whole Numbers 50–55 Paid Overtime Costs — Whole Dollars 62–69 Unpaid Overtime Hours — Whole Numbers 70–80 Unpaid Overtime Costs — Whole Dollars All positions not specified are left blank. Note: Form 4464, Daily Performance Adjustments Log—Adjust Abstract Report Only. Fields on the Managers Performance Adjustment record used to adjust Total Hours and Total Costs (Control Code = 0) include: Record Position Description 1 Record Code — Always "2" 2 Adjustment Code (2, 3, 4 or 9) — see IRM 3.30.19.5.9.3(4) 5 Control Code — Always zero 6 Funding Code (0, 1, or 2) — see IRM 3.30.19.2.6.4.1(3) 7 Temporary Category Code (0 or 9) — see IRM 3.30.19.2.6.4.1(4) 8–12 Organization Code — Required 13–15 Function Code — Required 16–20 Program Code — Required 21–24 Week Code — Required (MMDD) 25–26 Program Activity Worked — Optional but required to post to Abstract Report 27–28 Assigned Program Activity. Enter if different from Program Activity Worked — Otherwise, leave blank 62–69 Total Hours — Whole Numbers 70–80 Total Cost — Whole Dollars All positions not specified are left blank. Note: Form 8069, SCRS Managers Performance Adjustments Log — Adjusts Managers and Abstract Reports. Either the Total Hours or Total Cost field must be present; except for a delete. A Managers Performance Adjustment with a Program Activity Code and Funding Code will adjust Total basic hours and basic costs on the Abstract Report. These are basic hours. If these codes are not included, the Managers Report will be adjusted but the Abstract Report will remain unchanged. Required fields for deleting data from the Abstract Report are the Record Code, Adjustment Code (9), Control Code, Employment Category, Organization Worked, Program Activity Worked, and Week Ended. The Week Ended should be the last week on the file. The delete action will change the last week’s cumulative data to zero. This record will remain on the file for two weeks. If no further adjustments are made, the whole record will be deleted from the file. This two week delay allows the correction of an erroneous delete action before the record is purged from the file. Required fields for deleting data from the Managers Report include the Record Code, Adjustment Code (4 or 9), Control Code, Organization, Function, and Program. A delete adjustment to the Managers Report will not affect Abstract Report data. Performance adjustments adjust cumulative data only. Period data will not be changed. The Overhead Indicator on abstract adjustments is used to put the hours adjusted in the Overhead column for use in calculating the Overhead to Direct and Overhead to Total Percentages. A "9" indicates an adjustment to Overhead Hours; a "blank" adjusts Direct Hours. 3.30.19.2.6.6 (03-26-2014) Employee Detail Summary Report The Employee Detail Summary Report (PCC-42-40) is a weekly report which provides managers with data for tracking detailed employees between operations/departments and fiscal activities. See Exhibit 3.30.19-10 for a sample of the Employee Detail Summary Report. The report is printed in organization sequence. A page is generated for period and cumulative data, as well as pages for campus summaries. Each page lists the hours and costs (regular and overtime) for employees (permanent and temporary) detailed "To" and "From" an organization by operation/department and Program Activity Code. This report is used to track hours and costs when employees charge hours (detail their time) either to a different operation/department or to OFPs with a different Program Activity Code than their home organization and home PAC. There is a period data page and a cumulative data page. The Employee Detail Summary reflects the number of hours used and the cost of permanent, temporary, and overtime hours. It also identifies the program activity to which the hours are charged. The left side of the report (Detail To) describes details from the organization listed in the heading to the organizations and fiscal activities listed on the side of the report. The right side of the report (Detail From) describes details from the organizations and fiscal activities listed on the side of the report to the organization listed in the heading. The total hours detailed out "To" equal the permanent regular and overtime hours plus the temporary regular and overtime hours. The total hours detailed in "From" equal the permanent regular and overtime hours plus the temporary regular and overtime hours. When an employee is on detail to another area, the hours are not charged to the Assigned Organization, but the salary (cost) is still paid by the Assigned Organization. Only when the employee is on a temporary promotion, are the hours and costs charged to the Receiving Organization. All zero organizations or management activities will not print on the report. Information included in the Employee Detail Summary may be balanced to the "Inter-Activity Service Center Details-In and/or SC Det In" column on the Abstract Report. 3.30.19.2.6.7 (01-12-2017) Employee Detail Adjustments Employee Detail Adjustments are prepared whenever erroneous data (e.g., erroneous organizations or Form 3081, Employee Time Report prepared incorrectly) posts to an Employee Detail Job Record. Employee Detail Adjustments can be annotated on Form 8209, Employee Detail Adjustments Log, and then sent to the servicing WP&C Reports Team for processing. Fields on the Employee Detail Adjustment Log include: Record Position Description 1 Record Code — Always 4 2 Adjustment Code (2, 3, or 9) — see IRM 3.30.19.5.9.3(4) 6 Funding Code (0, 1, or 2) 8–12 Organization Worked — Required 25–26 Program Activity Worked — Required 27–28 Assigned Program Activity — Required 29–33 Assigned Organization — Required 45–49 Overtime Hours — Whole Numbers 50–55 Overtime Costs — Whole Dollars 62–69 Regular Hours — Whole Numbers 70–80 Regular Costs — Whole Dollars All positions not specified are left blank. At least one of the data fields, Regular Hours or Costs, Overtime Hours or Costs must contain data; except for a delete. Adjustment Code 2 must be used if adding hours to a record that did not previously exist, for example; if a Detail "From" Organization 31000 to 34000 (same program activity code) was incorrectly entered as a Detail "To" Organization 43000 and no other hours had been reported from Organization 31000 to 34000, then: Add the hours and costs to Organization 31000 to 34000 using Adjustment Code 2. Subtract the hours and costs from Organization 31000 to 43000 using Adjustment Code 3. Note: A record will be deleted using Adjustment Code 9 therefore, caution must be exercised when using this code. Before deleting a record entirely, determine if the record should be corrected using Adjustment Code 2 or Adjustment Code 3, if adding to or subtracting from a record. Note: The same Adjustment Codes used for adjusting the DPR, with the exception of Adjustment Code 4 will be used for Employee Detail Adjustments. 3.30.19.2.6.7.1 (03-26-2014) Production and Performance Adjustments Listing Valid production, performance, and Employee Detail Adjustments are printed on the Production and Performance Adjustments Listing (PCC-10-41). PCC-10-41 lists the valid Performance Adjustments Records, Production Adjustments Records and Employee Detail Adjustments for the day. It combines all like OFPs and totals for the day. This listing is for audit trail purposes and to be used as a reference if any of the output is not as expected. All negative adjustments are indicated by an alpha character in the last position of the volume. Close attention should be made to the alpha and numeric "0" on the PCC-15-02 WP&C Valid Transactions and Rollback Listing. PCC-15-02 lists the VALID records from PCC-10-89 WP&C Daily Transaction Records List, exception being that the summarized adjustment records generated by BBTS and PCD are listed individually. Codes are annotated as follows: Alpha and Numeric Code J = 1 K = 2 L = 3 M = 4 N = 5 O = 6 P = 7 Q = 8 R = 9 Blank = 0 or a special character 3.30.19.2.6.7.2 (01-12-2017) Managers Report Performance and Cost Control Record Volume figures without actual or scheduled hours are dropped from the Managers Report unless a Performance and Cost Control Record (PCC-60-81) is input for that function, except as described immediately below. Some functions such as Batching and Numbering, require reporting of volume data to individual returns programs for document control in the BPR and DPR, but because of the similarity of work, do not require reporting of hours to that detail. In these functions, volumes are generally reported to Program Code 00000 and hours are reported to the individual returns program. The Performance and Cost Control Record is used to summarize these volume figures under Program Code 00000 for the Managers Report. Under the roll up procedure, all programs with volume data and no actual or scheduled hours will be summarized to Program Code 00000. Programs with actual or scheduled hours charted will not roll up to the 00000 program but will be shown separately. These records are input as follows: Record Position Input 1–2 First 2 digits of the first Org Code 3–5 Function Code (First) 6–7 First 2 digits of the next Org Code 8–10 Function Code (Second) Continue keying organizations and functions as needed through position 75. Organizations and functions must be entered in ascending OF sequence, e.g. 31–110, 31–180, 34–190, 43–610. Key a "1" in position 78 if more than one P&C Control Record is used. Key a "K" in position 80. Campus Work Plan Schedulers will coordinate with the WP&C Reports Team and the Headquarters WP&C Coordinator, who will initiate with ECC-MEM and/or ECC-MTB the set-up or changes to this record. 3.30.19.2.6.7.3 (01-12-2017) Selected Master Data File Fast Print Control Record The Selected Master Data File Fast Print Control Records are used to obtain a fast print PCC-26-40, Selected Master Record List for WP&C Master File of specified records on the Master Data File to perform research and determine what data is present to reconcile balancing. Each record consists of the Program Code, Organization Code, and Function Code, in that order, in positions 1–13 and an "L" in position 80. Separate records are required for each POF requested. Contact the Headquarters WP&C Coordinator to determine if this listing will provide the information needed and to acquire this listing. 3.30.19.2.6.7.4 (01-12-2017) OFP Consistency File and Checks Batch and Production Control Records, Unit Production Records, and Performance and Production Adjustments are matched against the OFP Consistency File, Project PCA (551). Invalid records are printed on the Preliminary or Correction Error Registers. Program Activity Codes are carried on the OFP Consistency File indicating the Program Activity relating to each OFP. These are compared against Program Activity Codes carried on the Employee Master File to determine the extent of inter-activity details for the Abstract Report and the Employee Detail Summary. It is possible that some OFPs are used in the Performance and Cost system that were not used in Project PCA (551) and are thus not on the PCA-02 OFP Consistency File. For example, employee performance (MEPS) reporting for a program might include all 3 digits of function code (e.g. 231 and 232) but not include the more general code (230) as reported on the Daymast. These additional OFPs must be added to the OFP Consistency File. All OFPs that are used on Batch and Production Control Records or Unit Production Records must be entered on the OFP Consistency File. This includes individual return programs for Functions 180, 190, and 610 which were reported under the 00000 program code in Project PCA (34000–190–11110 etc.). The campuses no longer have the capability to establish, change or edit parent Organization, Function and Program code combinations on their OFP Consistency File. All changes of this nature must be submitted using the Form 5948 link via the OFP web site http://etd.ds.irsnet.gov/etd/ofp/index.asp. Detailed procedures for preparing Form 5948 are outlined in IRM 3.30.50.3.3, Update and Maintain OFP Consistency File. The OFP Coordinator for each Campus Directorship is responsible for coordinating updates to the OFP Consistency File for the campus. The OFP Coordinator for each Campus Directorship will notify the servicing WP&C Reports Team of all updates for parent OFP combinations requested from the Headquarters OFP Coordinator. The OFP Coordinator for each Campus Directorship will provide to the servicing WP&C Reports Team a copy of the Form 5498 to update child level OFP combinations. The WP&C Reports Team will review all PCA-02 updates and on a weekly basis review all PCA-02 output reports. The initiator of the request will be notified of any invalid conditions or failed postings by the WP&C Reports Team. 3.30.19.2.6.7.5 (01-12-2017) Project PCA and Work Schedule Inputs/Inputs from Project PCA Hour and cost data for the Managers, Abstract, and Program Analysis Reports and the Employee Detail Summary are obtained from the Project PCA Production Control Accounting (551). Project PCA provides weekly hour and cost figures by OFP and employee. These figures are subdivided into Overtime, Compensatory Time, Night Differential, Sunday Differential, and Compensatory Leave taken. In addition, PCA provides information on type of employee (Permanent, Temporary, etc.) and on the type of Program Activity (e.g. 2B = Returns Processing) that the employee is paid under. See IRM 3.30.50, Project PCA Production Control Accounting, for information on entering Program Activity Codes and Funding Codes on the Employee Master File. The Daymast File will be copied at the end of each week. One file will be used for daily updates beginning the next week and the other will be used for the weekly WP&C reports. 3.30.19.2.6.7.6 (03-26-2014) Work Schedule Inputs Work Schedule data from the Service Center Workload Scheduling System, Project PCB (562) is input to the Production Control and Performance Reporting system for use in the Daily Production, Managers and Abstract Reports. The Daily Master File must be updated weekly from the work schedule master files using Run PCC 01. During a reporting period, if a revised work schedule is produced for use in this system, the BOD must be notified in writing. The narrative should identify the changes made to the schedule and a summary of staff-hour changes (by operation/department) is required for any significant changes. The work plans and schedules described in IRM 3.30.127, Workload Scheduling, are an integral part of the budget process. The approximate dates of the work steps are issued by the BOD. See IRM 3.30.19.2.7, Quarter, Annual, and Basic Cut Over Procedures for requirements for work schedule input and for procedures for Quarterly and Annual cut overs. 3.30.19.2.7 (03-26-2014) Quarter, Annual, and Basic Cut Over Procedures Prior to the quarterly or semi-annual report period the WP&C Reports Teams will request that all operational areas take a physical inventory of all documents or returns on hand that are not under the Batch/Block Tracking System (BBTS) Batch Control. The documents or returns requiring physical inventory are those that have receipts, production and inventory reported on WP&C reports via Unit Production Records (UPCs). Operations will compare the physical inventory count to the inventory counts on the PCC-62-40 Program Analysis Report for the same week ending date of the physical inventory. They will submit in writing the inventory count and any adjustments to receipts, production and inventory via E-mail/fax to the WP&C Reports Team. Operations will be responsible to verify that all adjustment records have posted. Negative UPC inventories should be reconciled and brought to zero or greater. The WP&C Reports Team is responsible for verifying the physical inventory counts and inputting adjustment(s) for any organization reporting data on a campus WP&C. This includes Accounts Management, Compliance, Taxpayer Advocate, TE/GE, SPEC, etc. The WP&C Reports Team will coordinate this project to ensure the process is completed smoothly and that all adjustments post successfully prior to the end of the WP&C reporting period. On the last processing day of the cut-over period, all daily PCC processes will be completed this includes the DPR and BPR balancing. Submission Processing will provide an End of Quarter/End of Year Processing Schedule for production of the Quarterly Performance and Cost Reports. Planning and Analysis Staffs will ensure that the Master Schedule Tape is complete and available to update the Master File. PCC-01-40 will be run to produce the Service Center Master Data File POF List. (see IRM 3.30.19.2.7.3, Service Center Master POF List) 3.30.19.2.7.1 (03-26-2014) Midweek Quarter Ending Reports If the quarter ends on other than a Friday, Saturday, or Sunday, it is necessary to produce a quarterly Performance and Cost Report as of the end of the quarter. It is not necessary to produce a quarterly P&C Report on March 31. Use the following procedures to produce the quarterly report: Process Forms 3081 and production records for the short week. Produce Project PCA run PCA–03 for the quarter using a "Q" in the Project PCA Date Record. Complete Daily Processing for the last day of the quarter. Run the Quarterly Schedule Update Run (Run PCC–01Q). This run will: Copy the Daymast, Abstract and Employee Detail Files. One set of files can be used for end of quarter processing while the other set of files will be used for daily updates for the next quarter. Zero out quarterly elements on the files. Certain fields such as receipts and production for the DPR, will only be zeroed on Dec. 31. Replace the schedule data on the Daymast. Produce the SC Master Data File POF List. Note: Records with all zeros in the data fields (Scheduled Volume and Hours, Actual Volume and Hours, and Inventory) will be deleted only if the Adjustment Code is "9" . Run the End of Quarter Processing (Run PCC 40Q) using the copied files. Run PCC 01W — this must still be the first run of the next daily processing run. 3.30.19.2.7.2 (03-26-2014) End of Year Adjustments The closing inventories for each POF on the Master File as of the last day of the processing period will automatically be rolled over as the opening inventory for the first day of the new processing period. The other fields will be zeroed out automatically. In order to balance the DPR, adjustments must be made to include the inventories in each function as receipts. In the pipeline area, these inventories must show as processed work in each prior function. Special BBTS programming, the BBTS Beginning of Year file, provides new receipts and production figures for each OFP based on the batches of work remaining in the pipeline. This file creates all Production Adjustment Records needed to populate the Daily Production Report (DPR) as 3,2 Production Adjustment Records. Receipts in Functions 910 through 950 will be the same as opening inventories in Functions 910–950. Receipts in Function 610 will be the total of Function 610 production plus Function 610 inventory. Production in Function 230 will be the same as receipts in Function 610. Receipts in Function 230 will be the total of Function 230 production plus Function 230 inventory. Receipts and production for Functions prior to 230 are computed by BBTS’s "Beginning of Year" run according to the workflow established for each program. The receipts in each function must agree with the production from preceding functions. Cum Receipts and Production in Function 110 will equal the cum Receipts in Function 180 plus Function 170 minus the cum Receipts in Function 970 (Re-inputs), plus the inventory in all functions prior to Function 180. The BBTS Beginning of Year file will also create 3,2 Production Adjustment Records needed to set the inventory for Organization 43000 Functions 910 through 970 to zero for each program number (and sub-program number) that appears on the DLN Reference File for a campus that has a valid OFP for that campus. After the cumulative data is determined, WP&C Reports Teams will prepare Form 4465, Daily Production Adjustments Log for input of the production adjustments where needed. IRM 3.30.19.5.9.3. for more information on Form 4465. Once the inventory calculations have been completed, WP&C Reports Teams will total all inventories for Functions 910 to 940 and add them to cumulative receipts and production beginning with Function 610. Include the calculated inventories in all previous functions in the routing pattern for the specific Program Code continuing through Function 110. PCC-22-40 Daily Production Report (DPR) totals will differ from Pipeline Inventory Monitoring System (PIMS) totals by these calculations. Production Monitors should be notified of the adjustment amounts for monitoring purposes. Exhibit 3.30.19-8. for a sample of the PCC-22-40. For each OFP, post the cumulative receipts volume to "Cumulative Receipts Since January 1," positions 34–41 and the cumulative production volume to "Cumulative Production to End of Year," positions 57–64. Do not enter production in any other production or receipts field on the Form 4465, Daily Production Adjustments Log. To do so will cause it to appear on the Performance and Cost Report for the new year. Unit Production Adjustments — Receipts for Unit Production reporting will be the same as the opening inventory on the Organization Sequence DPR (PCC-24-40) for the first day of the new processing year. WP&C Reports Teams will enter the information in "Cum Receipts Since January 1" , positions 34 – 41 for each OFP as applicable. 3.30.19.2.7.3 (03-26-2014) Service Center Master File POF List The Service Center Master File POF List (PCC-01-40) is produced as an aid for WP&C Reports Teams in their year end processing and for Master File clean-up. This listing contains every POF combination that is on the Master File at the completion of processing and its closing inventory. The Last Action Date shows the year and Julian Date of the last posting to the POF. This tells whether all the transactions have posted or not. Schedule on File, Old and New. An "X" in one of these columns indicates that there was or is schedule information on the Master File. Hours or Cost. An "X" indicates that there are hours posted on the old Master File. Closing Inventory Forward. The closing inventory as of the last day of the year. 3.30.19.3 (03-26-2014) Validation of Data The input production records go through a series of validity checks that identify any error code, duplicate and invalid records; consistency checks for valid OFP combinations; and checks for attempts to delete and post to the same OFP. 3.30.19.3.1 (03-26-2014) Error Registers and Codes/Preliminary and Correction Error Registers The Preliminary Error Register (PCC-10-40) lists invalid conditions detected in Batch Control Records, Performance Adjustment Records and Production Adjustment Records. An 80 character image of the invalid records is printed followed by the appropriate error codes. During re-input processing the error register is retitled as the Correction Error Register. Performance Adjustment (Record Code 2) errors: Error Code Element Name Error Condition A Record Code Other than 2 B OFP Invalid (OFP) is not on OFP Consistency File or Delete Adjustment that doesn’t match a record on the file. D Adjustment Code Other than 2, 3, or 9. Adj. Code 4 is valid for Control Code 0 only. E Control Code Not equal to 0, 1, or 2. F Change Data Fields Data in these fields must be all numeric and right justified. If Adjustment Code = 2, or 3, one of these fields must contain data. If Adjustment Code = 4 or 9, these fields must be blank. G Change Data Fields Adj. Code = 2 and at least one data field contains a negative amount. H Total Hours or Costs A managers performance adjustment (Control Code 0) without data in either of these fields or not all numeric. I Employment Category Organization Worked Program Activity Worked Week Ended An Abstract Adjustment (Control Code 1 or 2) with other than all numerics in these fields. J All An Abstract Adjustment with no matching record on the file (Employment Category Organization Worked, Program Activity Worked, Week Ending Date). L Employee Type Code Invalid (Not equal to bb, 00, 02, 10, 11, 20, 21, 30, or 31). Overhead Indicator Invalid Overhead Indicator R All Attempt to update a deleted record. Z All Duplicate input record. Production Adjustment (Record Code 3) errors: Error Code Element Name Error Condition A Record Code Other than 3 B OFP Invalid or Delete Adjustment that doesn’t match a record on the file. D Adjustment Code Other than 2, 3, 4, or 9. F Change Data Fields Data in these fields must be all numeric and right justified. If Adjustment Code = 2, or 3, one of these fields must contain data. If Adjustment Code = 4 or 9, these fields must be blank. G Change Data Fields The Adjustment Code = 2 and at least one data field contains a negative amount. R All Attempt to update a deleted record. Z All Duplicate input record. Batch Control Record errors: Error Code Element Name Error Condition A Record Code Other than 7 B From OFP Invalid C To OFP Invalid (or From OFP = To OFP) D Type Code Other than 1, 3, or 5. E From Org From Function Type 1 only. Must be prior to 31000 (Org.) and 180 (Function). K Program Title Type 3 only. Must be present. N Batch Sequence No. Type 3 only. Must be all numeric. O Estimated Volume Type 3 only. The estimated volume must be present and all numeric if the From Function equals 180 or 210 and the To Function equals 190 or 210. P Actual Volume Type 3 only. Must be present and all numeric when From Function equals 190, or 230 or the To Function equals 230. Q Unit Production Type 5 only. Must be present and all numeric. R From OFP A delete adjustment (Adj. Code 9) is present for the same From OFP. S To OFP A delete adjustment (Adj. Code 9) is present for the same To OFP. T DIS Code Other than blank or D. U Adjustment Code Other than blank, 1, 2 or 3. V To Function To Function must be less than or equal to 210 (Type 1). W Receipts Types 1 and 5 only. Must be present and all numeric. X Release Date Release Cycle Earliest Rec'd Date Other than 001–366Not equal to 01–53Other than 001–366 Y Adjustment Type Code A field is present but is inconsistent with the type code. Z All Duplicate Record. Special error codes for Batch Control Record, Batch Profile Adjustment errors (Record Code 7, Adjustment Code 2, Type Code 3) include: Error Code Element Name Error Condition B Program Code Invalid. C Function Code From Function equals To Function. F Change Data Fields All of the data fields are blank. N Batch Sequence No. Not equal to 0001–9999. P Actual Volume Not all numeric or all blank. X Release Date Cycle Earliest Received Date Not all numeric or all blank. Special error codes for ISRP Batch Profile Adjustments (Record Code 7, Adjustment Code 3, Type Code 3) include: Error Code Element Name Error Condition B Program Code Invalid. M Function Code Not equal to Function 230. N Batch Sequence No. No matching batch in the function. P Actual Volume Not all zeros. Y Data Fields Data appears in unnecessary fields. Employee Detail Adjustment errors (Record Code 4) include: Error Code Element Name Error Condition A Record Code Other than 4. B Org. Worked / Org. Assigned Invalid. C Organization Program Activity The Assigned Organization and Program Activity is equal to the Organization and Program Activity Worked. D Adjustment Code Not equal to 2, 3, or 9. G Negative Data Field Adjustment Code equals 2 and at least one data field contains a negative amount. H Overtime Hours/Costs or Regular Hours/Costs No data in any of these fields or not all numeric. I Program Activity Funding Code Not all numeric. Not equal to 0, 1, or 2. J Organization Program Activity No matching data to adjust. (Adj. Codes 3 or 9). R Organization Program Activity A delete adjustment (Adj. Code 9) is present for the same Organization and Program Activity combination. X Overtime Hours/Costs or Regular Hours/Costs Data in Hours but not Costs or vice versa or no data in Hours (Adj. Code 2). Z All fields Duplicate input data. 3.30.19.3.2 (03-26-2014) Daily Adjustment Error Listing The Daily Adjustment Error Listing (PCC-20-40) lists adjustments that did not post to the master file. The listing consists of an image of the adjustment that did not post and a message explaining the reason why. These errors were previously checked in the Preliminary or Correction Error Registers. Errors could be the result of computer read fails or changes to files after the original error pass. Non-posted adjustments could lead to Cum figures for the current week that differ from expected figures. See Exhibit 3.30.19-11 for Error Messages. 3.30.19.4 (03-26-2014) Tape and Report Shipments The weekly and quarterly Performance and Cost Tapes are transmitted to the Detroit Computing Center for input to Project 540, N.O. Preparation of Service Center Work Plans, the "Blue Book," and several comparative analyses. See IRM 3.30.19.2.5(2) and (3) for shipping instructions. Weekly and quarterly Performance and Cost data is transmitted to Control D Web server and to Business Objects. 3.30.19.5 (03-26-2014) Service Center Production Control The production control portion of the system is designed to provide: a uniform and effective day-to-day control and routing of service center workloads in both pipeline and non-pipeline operations, and production reporting for such operations, which will provide managers with the means of ensuring that production processing is meeting or will meet the required cycle or desired completion date. It is not designed to establish controls or procedures normally associated with systemic or procedural controls such as Data Control, Media Transport and Control, or Accounting Controls. The production control portion of the system relates only to those programs, functions and organization elements of the campus that are required to report on work volumes. Workload volume counts used in production control will be the basis for all actual production counts required for the Performance and Cost Reports. The following procedures provide for arranging work into convenient groups of work, identifying these groups, and reporting on their progress. This section also provides detailed procedures for maintaining the Campus Production Control. These procedures deal with the campus processing only. They do not deal with processing of output tapes or reports at the Computing Centers or the Business Operating Division. All programs do not have the same significance. Therefore, information is not needed for all programs at the same frequency. The computer programs developed to produce production reports required in this system are designed to accept and process information daily which is the maximum frequency. Three computer generated reports are produced by this system: The PCC-32-40, Batch Profile Report (see Exhibit 3.30.19-6), The PCC-24-40, Daily Production Report by Organization (see Exhibit 3.30.19-7), and The PCC-22-40, Daily Production Report by Program (see Exhibit 3.30.19-8). The frequency of the reports is not controlled by the computer programs but by the frequency of information input. Daily input will produce daily reports and inputting data only one day a week will produce a weekly report. Two records are used in the system to input volumes of work units. The Production Control Record which is used for pipeline programs and the Unit Production Record (see Exhibit 3.30.19-13) which is used for non-pipeline programs. Pipeline programs are those programs which have a consistent pattern of functions through which the work must flow. Non-pipeline programs are those generally common to one function. Production Control Records are used as input to all three output reports provided in this system while Unit Production Records are usually used as input to the two daily production reports. These three reports are sent to Control-D Web and Business Objects. Service officials and managers must communicate security standards contained in IRM 1.4.6, Managers Security Handbook to subordinate employees and establish methods to enforce them. Employees are responsible for taking required precautions in providing security for the documents, information, and property which they handle in performing official duties. Employees who have access to and work with returns processing information and data in connection with this IRM must not alter the data, disclose information to persons without a need to know, use data for unauthorized purposes, or make unauthorized access to the data. 3.30.19.5.1 (03-26-2014) Batch/Block Tracking System All campuses currently use a National Standard Application Inventory System known as the Batch/Block Tracking System (BBTS). BBTS generates a disk file which is transmitted to the Enterprise Computing Centers (ECC-MEM and ECC-MTB) for the production of the BPR and the DPR. BBTS is used for input of managerial information for Project PCC (563). However, the following alternative methods can be used as back-up mechanisms when needed. For Project PCC (563), the following files can be input via ISRP along with a Form 813, Document Register or Form 1332, Block and Selection Record to control each block of work. Performance Adj. Records; File #s 10–82–001,002, and 003 Production Adj. Records; File # 10–83 Type 5 BPC Records; File # 10–85–003 Employee Detail Adj. Records; File # 10–84. The following files will be input via a terminal utilizing a user friendly front-end processor. DPR POF Control Records; File # 10–81 Date Records; File #s 01–80, 10–80 DPR OFP Control Records; File # 24–80 Select MF Print Control Records; File # 26–80 Employee Category Records; File # 46–80 PC Control Records; File # 60–81 Refer to local user manuals for ISRP instructions. 3.30.19.5.2 (03-26-2014) Production Reporting/Batch and Production Control Records Batch and Production Control Records are used to report volumes of individual batches of work and track these batches as they are processed through the pipeline. These records are attached to the batches and are input to the system each time a particular operation (function) is completed on that batch. Two types of volumes are reported on Batch and Production Control Records; estimated and actual. See Exhibit 3.30.19-12, Batch and Production Control Record Layout, and Exhibit 3.30.19-13, Unit Production Record Layout. 3.30.19.5.3 (03-26-2014) Pipeline Receipts Estimated receipt volumes are input to Type 1 control records for those functions prior to batching and numbering of documents. The elements of a pipeline receipts record are: Record Position Title Description 1 Record Code Always "7" 4 Type code Always "1" 8–12 From Organization Always 31000 13–15 From Function Must be a valid function code less than Function 180 16–20 Program Code Must be a valid Program Code 25–29 To Organization Must be a valid Organization Code 30–32 To Function Must be a valid Function Code less than or equal to function 210 33–40 Program Title The use is optional 41–48 Receipts Right justified, all numeric and zero filled 62–64 Earliest Received Date Julian Date (001–366) All positions not specified are left blank. See Exhibit 3.30.19-12. for Batch and Production Control Record Layout. Valid Organization, Function, and Program (OFP) Code combinations are prescribed in Document 5995A, via link to the OFP Web Site, http://etd.ds.irsnet.gov/etd/ofp. 3.30.19.5.4 (03-26-2014) Pipeline Production Reporting Actual Volumes are input to Type 3 Batch and Production Control Records from pipeline functions from the time the actual counts are determined in Numbering (Function 190) until the batches have cleared ISRP or SCRIPS. Estimated volumes are reported for batched documents before the actual counts are known. The elements of a pipeline production record are: Record Position Title Description 1 Record Code Always "7" 4 Type Code Always "3" 8–12 From Organization Valid organization code 13–15 From Function Valid function code 16–20 Program Code Valid program code 21–24 Batch Sequence Number 0001 through 9999 25–29 To Organization Valid organization code 30–32 To Function Valid function code 33–40 Program Title Input program title; do not leave blank 57–59 Release Date Julian date (001–366) 60-61 Release Cycle Input 01 through 53 62–64 Earliest Received Date Julian date (001-366) 65–68 Estimated Volume Input if the actual volume is not known. Must be present if From Function is 190 or 150. 69–72 Actual Volume Input if known, right justified and zero filled. Must be present if estimated volume is blank or From Function is 190 or 150. 73–79 Identification Optional field for service center use 80 ISRP Code Input a "D" when the Function Code is 230 or 450 All positions not specified are left blank. Exhibit 3.30.19-12. for Batch and Production Control Record Layout. Production in Function 230 or 450 is carried as a partial volume until the batch has cleared ISRP or SCRIPS as follows: The cleared ISRP volume is posted as production to ISRP. The cleared ISRP volume is posted as receipts to 43000–610 automatically. At the next posting, the cleared ISRP volume is credited as production for 43000–610. No input record is required for Function 610. Batches will automatically be credited to Function 610 after they have cleared ISRP. 3.30.19.5.5 (03-26-2014) Rollback Procedures When a Batch and Production Control Record is input to the system with a "From" Function of 190, the estimated and actual volumes must both have data. If the estimated volume is not equal to the actual volume, a production adjustment is generated for the cumulative receipts and production for each of the previous functions equal to the difference between the actual and estimated volumes. These may be found on the PCC-15-02, Valid Transactions and Rollback Listing. This may cause a minus opening inventory to appear in "From" Function 190. Also, the daily closing inventory for Function 190 is adjusted by the difference between the estimated and actual volumes. 3.30.19.5.6 (03-26-2014) Unit Production Records Unit Production Records are used to report receipts and processed volumes for all measured programs which are not under batch control. Unit Production Records should be prepared for each needed OFP as follows: Record Position Title Description 1 Record Code Always "7" 4 Type Code Always "5" 8–12 From Organization Valid Organization Code 13–15 From Function Valid Function Code 16–20 Program Valid Program Code 41–48 Receipts Must be present, right justified and zero filled 49–56 Production Must be present, right justified and zero filled 57–59 Release Date Julian Date (001–366) All positions not specified are left blank. See Exhibit 3.30.19-13. for Unit Production Record Layout. 3.30.19.5.7 (03-26-2014) Inputs from Control Data Analysis Batch and Production Control Records are generated by Project PCD (565), Control Data Analysis for input to the Daily Production Report. These Batch and Production Control Records provide receipts and production volumes for Functions 910 Errors, 920 Rejects, 930 BOBs, 940 Block Deletes, 950 "To MCC" , 960 Program Deletes, and 970 Re-inputs. They also will provide receipts figures for Function 180 Batching, for certain re-input documents. See IRM 3.30.126, Control Data Analysis, for the calculations of these volumes. Since the Control Data Analysis inputs will appear on the DPR and adjust the Function 950 volume, Project PCD (565) computer processing must be completed prior to the running of this system. 3.30.19.5.8 (03-26-2014) System Output Production Reports Report Name Output code Description PCC-01-40 Q Service Center Master POF List PCC-10-81 ("RJ" ) V POF Control PCC-22-40 D Daily Production Report POF Sequence PCC-24-40 D Daily Production Report OFP Sequence PCC-24-80 ("RP" ) V OFP control PCC-32-40 D Batch Profile Report PCC 40 W/Q Sort Performance Performance Reports Report Name Output code Description PCC-42-40 W/Q Employee Detail Summary Report PCC-46-40 W/Q Abstract Report PCC-60-40 W/Q Managers Report PCC-62-40 W/Q Program Analysis Report Fast Print Reports Report Name Output code Description PCC-26-40 V Master File Select List PCC-28-40 V Abstract Adjustment Reports Report Name Output code Description PCC-10-40 D Error Register PCC-10-41 D Production Performance Adjustment List PCC-15-02 D Valid Transactions and Rollbacks PCC-15-40 D Error Listing PCC-20-40 D Daily Adjustment Error List PCC-44-40 W/Q Abstract Error List Note "D" = Daily, "Q" = Quarterly, "W" = Weekly and "V" = Variable (must be requested). 3.30.19.5.9 (03-26-2014) Daily Production Report The Daily Production Report (DPR) provides daily scheduled and actual production, and cumulative data from January 1 through December 31. Inventory (returns in-house but not yet processed) and receipts data is also furnished. This report is used to monitor each day’s production as it flows through the various functions and processes. It relates actual to scheduled production on which staffing requirements were developed. It identifies abnormal inventories and production bottlenecks. Thus, it makes available to managers the necessary production information to permit prompt decisions regarding the use of overtime, adding or decreasing staff needs, etc., as necessary to achieve production goals. Before a Campus begins to process a new form type or program, Production Monitors should evaluate if the program will require daily monitoring. If so, procedures to add the program and subsequent functions to the Daily Production Report should be followed. Refer to IRM 3.30.19.5.9.1. The DPR is generated in two formats. The difference between the two formats is the arrangement of the data. One is produced in OFP sequence (PCC-24-40) and the other in POF (PCC-22-40) sequence. See Exhibit 3.30.19-7 and Exhibit 3.30.19-8 for samples of the PCC-24-40 and PCC-22-40. The DPR must be monitored daily to assure that the data input is correct. This data becomes part of the history base used to prepare the Work Plan and the Work Schedules for the next fiscal year. Volumes in Functions 910–970 are taken from Project PCD (565). See IRM 3.30.126, Control Data Analysis. 3.30.19.5.9.1 (01-12-2017) Daily Production Report Control Records Daily Production Report Control Records control the printing of the detail records and summary totals on the Daily Production Report. There are two kinds of DPR Control records; "RJ" Records (PCC-10-81) which controls the printing of the data in POF or workflow sequence, and "RP" Records (PCC-24-80) which controls the printing of the report in OFP sequence. An "RJ" control record is required for each detail and summary program to be printed in workflow sequence. These records are input as follows: Record Position Description 1–5 Input the program code to be printed. The records for summary programs must be input with an "X" in place of the zeros. For example, program code 37000 would be input as 37XXX. Control records must be in ascending program code sequence. 6 Input the type of output desired; "D" for Detail and "S" for Summary. 7–74 The print sequence of organizations and functions for a program. The first OF is input in positions 7–10, the next in positions 11–14, etc. (The first 2 positions of the Organization followed by the first 2 positions of the Function, e.g. OF 31000 – 110 = 3111). This printing may be either in workflow or ascending numerical sequence. A maximum of 17 OF combinations will fit on a record. 75–78 Blank 79 If more than 17 OF sequences are needed, input a "B" in position 79 to indicate that additional OF sequences are following on a second record. Input positions 1-6 of the second record the same as the first record and then input the next OF combination in positions 7–10. Only the first record will have a "B" in position 79. Only two records are allowed (34 OF combinations) for a single program. 80 Input "J" . Positions remaining after the last organization and function code combinations are left blank in record positions 7–74. Any organization and function code combination not listed will not be printed on the Daily Production Report. Any Batch and Production Control Records that are not matched on the OFP Consistency File will be printed on an error listing. When establishing and maintaining Daily Production Report Control Records via PCC-10-81 consider the following: The first five digits (program code) of every record, must be listed in ascending order. Begin with the lowest number and graduate to the highest number. If the Program codes are not listed in ascending order, the PCC 22 run will stop at the first Program code that is numerically out of order. When establishing the alpha fifth digit "X" DPR Control Records for the Summary program, follow the highest fifth digit program number. Functions 910, 920, 930, 940, 950, 960, and 970 should be established for all Parent Program Codes (Program numbers that end in zero) that flow through normal GMF processing. Functions, 910, 920, 930, 940, 950, 960, and 970 should be established for all Summary Records that are created for Parent Program Codes. Function 950 (only) should be established for Child Program Codes (Program numbers that end in numbers 1 - 9). 910-940 and 960-970 should not be established for Child Program Codes. All Parent Program Codes that have one or more Child Program Code should have a Summary Record. When there is one or more Child Program Code, the Parent Program Code should be established. When an update is required for Daily Production Report Control Records via PCC-10-81 use the following guidance: Contact the Headquarters WP&C Coordinator to request a current copy of PCC-10-81. After receiving PCC-10-81, update as follows: (1) to add highlight updates in blue (2) to delete highlight updates in red (3) to change highlight updates in green . E-mail the updated PCC-10-81 providing the implementation date (MMDDYYYY), to the Headquarters WP&C Coordinator for processing. Use the "RP" Record (PCC-24-80) to print the DPR in OFP sequence. Starting in positions 1 through 38 input the two high order digits of each organization to appear on the PCC-24-40 DPR report. The organization codes must be in ascending sequence with blanks between the organization codes. Input a "P" in position 80. 3.30.19.5.9.2 (01-12-2017) Balancing the DPR Each work day review the PCC-10-40, PCC-15-40 and PCC-20-40 Daily Error Registers for production records from the prior day that did not post. If the reason the record appears is due to an action taken by the Production Monitor (Received Date Change, Cycle Change, or Volume Change), no action is needed. If the reason the record appears is not known, the Production Monitor should contact their servicing Reports Team or the Headquarters WP&C Coordinator for assistance in resolving the issue. Closing inventories on the PCC-32-40 Batch Profile Report should match the closing inventories on the PCC-22-40 Daily Production Report. The inventories and receipts for Function 910 through Function 970 on the PCC-22-40 DPR should match the inventories and receipts on the PCD-03 Block Proof Summary Report. Manual changes made to the Block Proof Summary via a Form 8350 processed by the Campus Data Control function must be adjusted into the PCC-22-40 DPR each day. See Exhibit 3.30.19-9 for do’s and don’ts of Function 9XX adjustments. Using the Summary X level program code on the PCC-22-40 DPR verify that the DPR Function 910 through Function 970 are in balance with Function 610. The cumulative Actual Production for Function 610 equals the sum of: Cumulative Actual Receipts for Function 970, Function 960 and Function 950 plus the Closing Inventories for Function 940, Function 930, Function 920 and Function 910. Using the Summary X level program code verify that the DPR Function 110 through Function 610 are in balance with Function 110 Receipts. The cumulative Actual Receipts for Function 110 equal the sum of: Cumulative Actual Production for Function 610 plus the Closing Inventories for Function 610, Function 230, Function 190, Function 210, Function 180 and Function 170 minus Function 970 Cum Receipts. If the site uses BBTS routes that include Function 300, Function 340, or Function 880, the inventories from those functions should also be included in the calculation. At least once per week the DPR child level sub-program codes should be verified. These programs will have routes (function codes) through each pipeline function but will only have PCD-03 Function 950. The Function 950 Cumulative Actual Receipts equals the Function 610 Cumulative Actual Production. The Cumulative Actual Production for Function 610 plus the Closing Inventory for Function 610, Function 230. Function 190, Function 210, Function 180 and Function 170 plus any additional functions that were in the route (Function 300, Function 340, or Function 880) equal Function 110 Cumulative Actual Receipts and Cumulative Actual Production. When steps 1 through 5 above have been completed and the reasons for the differences are identified, contact the servicing Reports Team to discuss the discrepancies and request adjustments. Note: Closing Inventories with negative counts must be reconciled and adjusted except for Function 170 and Function 180 for programs that are monitored via the Pipeline Inventory Monitoring System (PIMS) and Function 950, MCC Good Transactions. See IRM 3.30.19.5.9.3 for Production Adjustments information. Campus Production Monitors should be contacted prior to any adjustments for Function 110, Function 170, or Function 180 when programs are monitored by the Pipeline Inventory Monitoring System (PIMS). Function 110 should never have an inventory. If the report reflects an inventory in Function 110 steps should be take immediately to identify the cause and correct the record. 3.30.19.5.9.3 (03-26-2014) DPR Production Adjustments Adjustments to cumulative data are accomplished by use of performance and production adjustment records. These records adjust cumulative data only — period data will not be affected. The exception to this is "Production This Week" on Form 4465, Daily Production Adjustments Log, which is a period adjustment. Production adjustments to the Daily Master File are made by using Production Adjustment Records to add, subtract, or replace fields on the master data file. Production Adjustment Records are designed to permit manual entries to be input from entries made on Form 4465, Daily Production Adjustments Log. Elements on the Daily Production Adjustment Record include: Record Position Title 1 Record Code — Always "3" 2 Adjustment Code 8 – 12 Organization Code 13 – 15 Function Code 16 – 20 Program Code 26 – 33 Receipts this quarter 34 – 41 Cumulative Receipts since January 1 42 – 48 Cumulative production this week 49 – 56 Cumulative production to end of scheduling period 57 – 64 Cumulative production to end of year 65 – 72 Daily closing inventory 73 – 80 Actual production first six or nine months All positions not specified are left blank. See Exhibit 3.30.19-14 for WP&C/DPR record layout. Performance and production adjustment codes include: Adj. Code Action 2 Establish or replace adjustment amounts for amounts on the master file. 3 Add or subtract adjustment amounts to the amounts on the master file. 4 Delete the performance (production) fields from the matching record on the master file. Not valid for Abstract Performance Adjustments (Control Code 1 or 2). 9 Delete the entire matching record from the file. (Do NOT use unless approved by the WP&C Coordinator, Submission Processing, Project Management Process Assurance Branch, Quality Section). General rules for production adjustments: Never adjust the inventory for Functions 110, 610, 960 or 970 unless you are correcting an erroneous adjustment that has posted to this field. Function 110, 960, and 970 inventories should always be zero; Function 610 closing inventory should always be the same as the Function 230 production on the same day. Any adjustment to production for Function 230 must also be made to Function 610 receipts and production and Function 950 receipts and inventory. When you add to receipts only, you must add to closing inventory by the same amount. When you subtract from receipts only, you must subtract from closing inventory the same amount. When adding to production only, subtract the same amount from closing inventory. When subtracting from production only, add the same amount to closing inventory. When adding the same amount to receipts and production, make no adjustment to closing inventory. When making adjustments, the inventory adjustment must equal the receipts adjustment minus the production adjustment. When both receipts and production are positive, the inventory adjustment must be positive if receipts is greater than production and negative if production is greater. When both receipts and production are negative, the inventory adjustment must be negative if the receipts adjustment is a larger number and positive if the production adjustment is a larger number. When the receipts adjustment is positive and the production adjustment is negative, the inventory adjustment must be positive and equal to the sum of the two without the signs. When the receipts adjustment is negative and the production adjustment is positive, the inventory adjustment must be minus the sum of the two without the signs. Exhibit 3.30.19-9. as a guide for making DPR adjustments. These adjustments are made from reports specified in IRM 3.30.126, Control Data Analysis. 3.30.19.5.9.4 (03-26-2014) Sample Manual Adjustments A batch has been established on the file with a "From" Function other than 180 (Error Code A on BPR). For example, if the sequence was input as 210–190–230 instead of 180–210–190–230. See Exhibit 3.30.19-14 and Exhibit 3.30.19-15 for the BPR Adjustment record layouts. The following adjustments must be made on the Form 4465, Daily Production Adjustments Log. (The receipts and inventory should have been input to Function 180 from the Type 1 record). Function 180 PLUS Production, MINUS Inventory; Function 210 PLUS Receipts, PLUS Inventory. The Daily Production Report and the Batch Profile Report inventories will be off by the volume on the Function 180 record. On those batches that have been numbered before Batching (With Remit documents), care must be taken to ensure that the actual and estimated volumes are the same. If they are not, adjustments are required to correct the difference between the estimated and actual volumes on the Function 210 record. The Cum Volume Cleared ISRP is greater than the batch volume (Error Code B). If the batch volume in ISRP (Actual Volume) is 2000 and the Cum Volume Cleared ISRP is 3000. (Sequence 110–180–210–190–230). Case 1: The Cum Volume Cleared ISRP (3000) is correct. Make the following adjustments on the Form 4465, Daily Production Adjustments Log. Make a Batch Profile Adjustment (Record Code 7, Adj Code 3, Type Code 3) with 3000 in Actual Volume (positions 69–72). Add 1000 (3000–2000) to Receipts and Inventory for Function 230. Add 1000 to Receipts and Production for Functions 210 and 190. Add 1000 to Receipts and Production for Function 180. Add 1000 to Receipts and Production for Function 110. Case 2: The Actual Volume (2000) is correct. Make the following adjustments on the Form 4465, Daily Production Adjustments Log. Subtract 1000 from Production and add to Inventory for Function 230. Subtract 1000 from Receipts and Production for Function 610. Subtract 1000 from Receipts and Inventory for Function 950. Make a Function 230 Batch Control Record (Record Code 7, Adj code 1, Type Code 3) with 0000 in Actual Volume to drop the batch off the report. Case 3: Neither volume is correct. Determine the correct volume (e.g., 2600). Make corrections to prior functions (For 600 documents as in IRM 3.30.19.5.9.4). Make corrections to cleared functions (For 400 documents as in IRM 3.30.19.5.9.4). Make a Function 230 Batch Control Record (Record Code 7, Adj Code 1, Type Code 3) with 0000 in Actual Volume. 3.30.19.5.9.5 (03-26-2014) Date Records Date Records are used to provide input dates for the system. They control processing and provide the dates that appear on the daily and weekly Production Control and Performance Reports. Specific fields on the date record include: Record Position Description 0 Record Code (Position 1). 31–36 Saturday week ending date — Input the calendar (month, day, year). 37–39 Julian date. 40–45 Report date — Current date for the BPR and DPR (Input the Monday–Friday calendar date). 46–48 Julian date. 49 Day code — Input the applicable code for the day corresponding to the Report Date above. The day codes are:0 — Sunday1 — Monday2 — Tuesday3 — Wednesday4 — Thursday5 — Friday6 — Saturday The Quarter Ending Date, Quarter Ending Julian Date and Quarter Ending Day Code are entered in positions 50–55, 56–58, and 59 respectively. The campus initials are entered in positions 60–61. Valid initials are AN, AT, AU, B, C, F, KC, M, O, and P. Single initials are entered in position 61 with position 60 left blank. Process indicator (Position 62) – Q = Quarterly/Yearly; W = Weekly/Daily Processing. An asterisk (*) will be entered in position 80 to indicate a mid-week reschedule. Otherwise leave blank. Specific Date Checks — Daily/Weekly Processing: The report date must be one day greater than the date on the Daymast File and within the same week as the Saturday Week Ending Date. The report date must be within the quarter defined by the quarter ending date. The Process Indicator must be equal to "W" . Specific Date Checks — End of Quarter Processing: The Quarter Ending Date must be a valid Quarter Ending Date (June 30, September 30, or December 31). If the quarter ends on a day other than a Friday, Saturday or Sunday, the report date must equal the quarter ending date. If the quarter ends on a Friday, Saturday or Sunday, the report date is the last Friday in the quarter. The report date must be one day greater than the date on the Daymast File and within the same week as the Saturday Week Ending Date. The Process Indicator must be equal to "Q" . Specific Date Checks — Normal Weekly Schedule Updates: The Process Indicator must equal: "W" for weekly updates or "Q" for quarterly updates. The report date must be greater than the report date on the Daymast. The Saturday Week Ending Date must be exactly 7 days greater than the week ending date on the Daymast. The Quarter Ending Date must be a valid Quarter Ending Date. Specific Date Checks — Mid-Week Reschedule: The Report Date, Saturday Week Ending Date, and Quarter Ending Date must be equal to the dates on the Daymast. An asterisk (*) must be in position 80. The Process Indicator must be equal to "W" . Specific Date Checks — Special processing for holidays: If a holiday occurs on Monday, Tuesday, Wednesday, or Thursday, some special processing is required to produce the runs and remain consistent with the date checks. No special processing is required for a Friday holiday except when the New Years holiday occurs on Friday, December 31. If the holiday is a Monday: Run PCC 01 and Update Daymast Schedules should be run with a Monday date. Runs PCC 10A and PCC 10, Validate Transaction Records should be run with a Monday date. After performing these runs proceed with normal Tuesday processing. If the holiday is a Tuesday, Wednesday, or Thursday, (or Friday holiday occurring on December 31) perform Runs PCC 10A and PCC 10 with the holiday date and then proceed with normal processing. 3.30.19.5.9.6 (03-26-2014) Daily Date Records The Daily Date Record (PCC-10-80) is used for the Daily Master File update from Batch and Production Control Records. It controls DPR and BPR processing. Specific fields on the date record include: Record Position Description 1 Record Code 0 31–38 Saturday week ending date — Input the calendar date in mmddyyyy format. 39–41 Saturday Julian Date in ddd format. 42–49 Report Date — Current date for the BPR and DPR — Input the Monday-Friday* calendar date in mmddyyyy format. 50–52 Report Julian Date in ddd format. 53 Day code — Input the applicable code for the day corresponding to the Report date above. These day codes are:0 — Sunday1 — Monday2 — Tuesday3 — Wednesday4 — Thursday 5 — Friday6 — Saturday 54–61 Quarter Ending Date — Input the calendar date in mmddyyyy format. 62–64 Quarter Ending Julian Date in ddd format. 65 Quarter Ending Day Code (same day codes as above) 66–67 Campus Initials: AN, AT, AU, B, C, F, KC, M, O, P 68 Process Indicator — Always "W" 69–79 Blank 80 Mid-Week Reschedule Indicator Report Dates: When the Quarter Ending Date (i.e., June 30, September 30, or December 31) falls on a Monday through Friday, the Saturday Week Ending Date will be later than the Quarter Ending Date. The Report Date is normally a Monday through Friday. However, a "Supplemental" run can be performed (usually using a Saturday date) to capture Unit Production Record Data. The Quarter Ending Date must be June 30, September 30, or December 31. Valid campus initials are AN, AT, AU, B, C, F, KC, M, O, and P. Single initials are entered in position 67, with position 66 left blank. An asterisk (*) will be entered in position 80 to indicate a mid-week reschedule. Otherwise position 80 is left blank. Specific Date Checks — Daily Processing: The report date must be one day greater than the date on the Daymast File and within the same week as the Saturday Week Ending Date. (Weekdays cannot be skipped). The report date must be within the Quarter defined by the Quarter Ending Date. Specific Date Checks — Special processing for holidays: If a holiday occurs on Monday, Tuesday, Wednesday, or Thursday, special processing is required to produce the runs and remain consistent with the date checks. No special processing is required for a Friday holiday except when the New Years Holiday occurs on Friday, December 31 (because it is a Quarter Ending Date). If the holiday is a Monday: Run PCC 01, Update Daymast Schedules, (should be run with a Monday date), run PCC 10A and PCC 10 Validate Transaction Records with a Monday date. After running these runs, proceed with normal Tuesday processing. If the holiday is a Tuesday, Wednesday, or Thursday (or Friday holiday occurring on December 31): Run PCC 10A and PCC 10 with the holiday date and then proceed with normal processing. 3.30.19.5.9.7 (03-26-2014) Weekly Date Records The Weekly Date Record (PCC-01-80) is used to initialize a new processing week or initialize a new quarter. It controls the WP&C report processing. Specific fields on the date record include: Record Position Description 1 Record Code 0 31–38 Saturday Week Ending Date — Input the calendar date in mmddyyyy format. 39–41 Saturday Julian Date in ddd format. 42–49 (Sunday) Week Beginning Date — Input the calendar date in mmddyyyy format. 50–52 (Sunday) Julian Date in ddd format. 53 Day code — Input the applicable code for the day corresponding to the Week Beginning Date above. These day codes are:0 — Sunday 1 — Monday2 — Tuesday3 — Wednesday4 — Thursday5 — Friday 54–61 Quarter Ending Date — Input the calendar date in mmddyyyy format. 62–64 Quarter Ending Julian Date in ddd format. 65 Quarter Ending Day Code (same day codes as above) 66–67 Campus Initials 68 Process Indicator — "W" or "Q" 69–79 Blank 80 Mid-Week Reschedule Indicator Date Checks — Beginning and Ending: When the Quarter Ending Date (i.e., June 30, September 30, or December 31) falls on a Monday through Friday, the Saturday week ending date will be later than the Quarter Ending Date. The Week Beginning Date is normally a Sunday. However, when a Quarter Ending Date is a Sunday, Monday, Tuesday, Wednesday, or Thursday, the Week Beginning Date will not be Sunday. The Week Beginning Date cannot be a Saturday. The Quarter Ending Date must be June 30, September 30, or December 31. Valid Campus Initials are AN, AT, AU, B, C, F, KC, M, O, and P. Single initials are entered in position 67, with position 66 left blank. An asterisk (*) will be entered in position 80 to indicate a mid-week reschedule. Otherwise position 80 is left blank. Specific Date Checks — Normal Weekly Processing: The Week Beginning Date must be greater than the date on the Daymast File and within the same week as the Saturday Week Ending Date. The Week Beginning Date must be within the quarter defined by the Quarter Ending Date. The Process Indicator must be "W" . The Weekly Date Record for the period that contains the Quarter Ending Date must contain Process Indicator "W" . (The next Weekly Date Record — for the first period in the new quarter — will require the Process Indicator "Q" . Special Date Checks — Normal Weekly Schedule Updates: The Process Indicator must equal: "W" for weekly updates or "Q" for quarterly updates. The Week Beginning Date must be greater than the report date on the Daymast File. The Saturday Week Ending Date must be exactly 7 days greater than the Week Ending Date on the Daymast File. The Quarter Ending Date must be a valid Quarter Ending Date. Specific Date Checks — Mid-Week Reschedule: The Week Beginning Date, Saturday Week Ending Date, and Quarter Ending Date must be equal to the dates on the Daymast. An asterisk (*) must be in position 80. The Process Indicator must be "W" . End of Quarter Processing: The Quarter Ending Date must be a valid Quarter Ending Date (June 30, September 30, or December 31). The Week Beginning Date must be one day greater than the date on the Daymast File and within the same week as the Saturday Week Ending Date. The Week Beginning Date must be within the quarter defined by the Quarter Ending Date. The Process Indicator must be "Q" for the first period after the period that contained the Quarter Ending Date. 3.30.19.5.10 (03-26-2014) Batch Profile Report The (BPR) Batch Profile Report (PCC-32-40) is used by pipeline managers to track and plan the work for their areas. The BPR is received daily and is generated by data input from the batch control records from BBTS. See Exhibit 3.30.19-6 for a sample of the PCC 3240. The BPR complements the DPR. It reflects the location of batches of work by program in the pipeline functions on any given day, and is a means of identifying and tracking over age and/or expedite batches. The BPR shows the daily flow of work in progress in the pipeline by program and function. The format of this report is a program major with all batches relating to such program as minor. The BPR contains page breaks after each five digit program number. For each program number, the related batches are listed in numerical sequence. This facilitates monitoring of selected programs and serves as a means of identifying and tracking behind schedule and expedite batches. Also furnished as line items are the workload inventories for each function in the pipeline for each program. 3.30.19.5.11 (03-26-2014) Batch Profile Production Adjustments Batch Profile Adjustments are used to replace fields on the Batch Profile with fields from the Batch Profile Adjustment Records. Input data can be entered on Form 5406, Batch Profile Adjustment Log. Fields on the Batch Profile Adjustment Log include: Record Position Title 1 Record Code — Always "7" 2 Adjustment Code — 1, 2, or 3; see IRM 3.30.19.5.11(3) 4 Type Code — Always "3" 8–12 From Organization Code 13–15 From Function Code 16–20 Program Code 21–24 Batch Sequence Number 25–29 To Organization Code 30–32 To Function Code 33–40 Program Title 57–59 Release Date (Julian 001–366) 60–61 Cycle 62–64 Received Date (Julian 001–366) 65–68 Estimated Volumes 69–72 Actual Volume 80 ISRP Code "D" or Blank All positions not specified are left blank. See Exhibit 3.30.19-14 for BPR Adjustment record layout. Adjustment Codes for Batch Profile Adjustments include: Adj. Code Action 1 Drop record from BPR one day after current processing. 2 Correct erroneous report data on BPR. 3 Adjust ISRP volumes when the sum of the partial batches doesn’t equal the actual volume. The Record Code, Adjustment Code, Type Code, Program Code and Batch Sequence Number are required. Other fields are input only if the data is being changed. The "From" Organization and "From" Function Codes are required for ISRP Adjustment Code 3 adjustments. If either the "From" Organization and Function Codes or the "To" Organization and Function Codes are present, the other codes must also be present also. To drop a record from the Batch Profile (7–1–3 adjustment), only the Record Code, Adjustment Code, Type Code, Program Code, Batch Sequence Number, and Actual Volume should be input. The Actual Volume should be 0000. See IRM 3.30.19.5.9.4 for Sample Manual Adjustments to the Batch Profile Report. 3.30.19.6 (03-26-2014) Individual Performance This system provides a uniform system for reporting all staff-hours required for Performance and Cost Reports. 3.30.19.6.1 (03-26-2014) Scope All employees assigned to report to the campus WP&C will use Form 3081, Employee Time Report to report staff-hours. These staff-hours will reflect OFP Code combinations containing five digit specific Organization Codes, three digit specific Function Codes, and five digit specific Program Codes (see Exhibit 3.30.19-1) Form 3081 data for campus employees is used for Project PCA and Measured Employees Performance System (MEPS). All campuses use a system which combines time reporting for workload and time and attendance (T&A) called Single Entry Time Reporting (SETR). Specific details on filling out paper Form 3081 can be found in IRM 3.30.50, Project PCA Production Control Accounting or in the "SETR Form 3081 Employee Time Reporting Guide" located at http://erc.web.irs.gov/DOCS/2002/AWSS/PS/Setr/Guide3081.pdf. Details on completing the SETR 3081 can be found in the "Manager's Guide to SETR" located at http://erc.web.irs.gov/DOCS/2002/AWSS/PS/SETR/Manager'sGuide.htm. 3.30.19.6.2 (03-26-2014) Related IRMs The detailed instructions for completion of all employee records and provision for individual performance outputs are contained in IRM 3.30.50, Project PCA Production Control Accounting, and IRM 3.43.405, Measured Employees Performance System (MEPS) for Managers of Measured Employees. The manual for Project PCA is maintained by SE:W:CAS:SP:PM:Q. The manual for MEPS is maintained by SE:W:CAS:SP:PM:Q. 3.30.19.6.3 (03-26-2014) Output Provided Campus assignment of the third digit of a Function Code to produce reports reflecting sub-breaks of data is allowable as prescribed in IRM 3.30.20, Organization Function and Program (OFP) Codes. In cases where only summaries of data by operation or department are desired (in lieu of individual employee data), the options afforded in the computer programs for Project PCA (551) should be employed. Printouts may be produced by operation or department by use of appropriate control records provided in Project PCA (551). 3.30.19.7 (03-26-2014) Obsolete Incentive Pay Program The Incentive Pay Program is obsolete. 3.30.19.8 (03-26-2014) Work Planning and Control (WP&C) System, Organization, Function and Program (OFP) Code List IRM 3.30.20, Organization Function and Program (OFP) Codes, and Document 5995A contain guidelines, procedures and instructions applicable to the various OFP codes. IRM 3.30.20, Organization Function and Program (OFP) Codes, is distributed on separate schedule and Document 5995A is available via the OFP Code Web Site link located at http://etd.ds.irsnet.gov/etd/ofp/index.aspto ensure the availability to all units at the campuses and all appropriate organizations in the business operating divisions. 3.30.19.9 (03-26-2014) Reconciliation of Payroll and Performance and Cost Report The Reconciliation of Payroll and Performance and Cost Report, Form 5462 is a periodic report designed to provide the BOD a tool to help maintain the integrity of the WP&C reports. This report is a recap of Payroll monies paid out by the Treasury on behalf of the campus. The recaps identify by category the amounts paid out for regular time, overtime, night differential, holiday pay, etc. The expended hours and the cost of those hours, as reflected in the WP&C Managers Report (PCC-60-40) and the Abstract Report (PCC-46-40) are combined, and then compared to the totals from the Payroll recaps. The resulting report is the Payroll Reconciliation Report. The following current reports are needed to prepare Form 5462, Reconciliation of Payroll and Performance and Cost Report: Grade Structure and FTE Realized Report, Report GS6, Managers Report, Abstract Report, SCRS Managers Performance Adjustments Log, Form 8069, and Payroll Accounting Report. Refer to BOD guidelines for preparation of the Reconciliation of Payroll and Performance and Cost Report, Form 5462. Exhibit 3.30.19-1 Organization, Function and Program Code Below is a layout describing the breakdown of an OFP code for the Submission Processing and Compliance Services campuses. Organization Function Program 12345 678 9 10 11 12 13 00000 000 0 00 00 00 00 1 – Campus2 – Operation 3 – Department4 – Team5 – Team 6 and 7 - Work Action or Group Actions8 - Specific Action 9 - Major Program Area10 thru 13 – Used as necessary to identify returns, documents, and categories Note: Orgs 2X - 3X are used for Submission Processing. Orgs 7X - 8X are used for Compliance Services. Below is a layout describing the breakdown of an OFP code for the Accounts Management campuses. Organization Function Program 12345 678 9 10 11 12 13 00000 000 0 00 00 00 00 1 – Customer Campus/ Operations2 – Department 3 – Team4 – Team5 – Team 6 and 7 - Work Action or Group Actions8 - Specific Action 9 - Major Program Area10 thru 13 - Used as necessary to identify returns, documents, and categories Note: Orgs AX - FX are used for Accounts Management. Below is a layout describing the breakdown of an OFP code for Stakeholder Partnerships, Education and Communication (SPEC). Organization Function Program 12345 678 9 10 11 12 13 00000 000 0 00 00 00 00 1 – Business Operating Division2 – Area 3 – Territory4 – Team5 – Team 6 and 7 - Work Action or Group Actions8 - Specific Action 9 - Major Program Area10 thru 13 - Used as necessary to identify returns, documents, and categories Note: Org KX is used for Stakeholder Partnerships, Education and Communication (SPEC). Exhibit 3.30.19-2 Broad Program Summaries Below is an explanation of how program codes are categorized. PROGRAM CODES EXPLANATION 0XXXX General Programs 1XXXX BMF Programs 2XXXX Statistics of Income Operation Programs 3XXXX Miscellaneous Programs 4XXXX IMF Programs 50XXX - 57XXX Agency Wide Shared Services / Strategic Human Resources 58XXX - 59XXX Overhead Programs 60XXX Telephone Programs 61XXX - 68XXX Collection Programs 7XXXX NMF and EP Programs 78XXX - 79XXX Information Technology 8XXXX Special Programs 90XXX - 95XXX Fraud Detection / Criminal Investigation and Examination Programs 97XXX - 98XXX Special Programs Exhibit 3.30.19-3 Daily Workload and Staff-hours Schedule Report (PCB-04-40) Below is an example layout of a Daily Workload and Staff-hours Schedule Report (PCB-04-40). P-R-F PCB-04-40 DAILY WORKLOAD AND STAFF HOURS SCHEDULE REPORT DATE 12-23-2008 SERVICE CENTER PERIOD BEGINNING 01-01-2009 PERIOD ENDING 06-30-2009 REVISION NO. 4 Org 34000 DOCPROP FUNCTION 190 NUMBERNR PROGRAM 42900 8453 STD MON VOL TUE VOL WED VOL THU VOL FRI VOL WKLY VOL WKLY SH’S W/E 003 01-03 W/E 010 01-10 W/E 017 01-17 980.3 9 101 2,145 7,548 9,803 10 W/E 024 01-24 1,245.10 69,233 42,822 112,055 90 W/E 031 01-31 1,382.50 128,568 63,783 64,041 64,345 320,737 232 W/E 038 02-07 1,359.10 42,815 256,710 128,686 171,096 147,317 746,624 549 W/E 045 02-14 1,356.70 146,637 381,160 199,942 127,481 128,292 983,512 725 W/E 052 02-21 1,357.50 202,278 506,911 101,127 198,186 1,008,502 743 W/E 059 02-28 1,356.90 92,177 215,004 228,053 117,233 107,071 759,538 560 W/E 066 03-07 1,357.40 124,302 264,421 151,100 42,446 138,544 720,813 531 W/E 073 03-14 1,356.30 68,496 225,666 92,657 71,104 108,100 566,023 417 W/E 080 03-21 1,357.80 55,498 216,822 94,227 36,248 85,504 488,299 360 W/E 087 03-28 1,351.80 49,750 192,268 70,351 85,725 64,345 462,439 342 W/E 094 04-04 1,357.60 60,881 97,247 110,869 24,344 64,236 357,577 263 W/E 101 04-11 1,362.80 105,902 140,037 85,794 100,164 85,648 517,545 380 W/E 108 04-18 1,358.00 42,775 141,631 117,971 149,950 128,493 580,820 428 W/E 115 04-25 1,360.10 180,699 150,118 128,620 5,888 1,287 466,612 343 W/E 122 05-02 1,340.50 39,251 48,688 20,382 17,403 8,959 134,683 100 W/E 129 05-09 1,348.50 313 55,369 11,012 28,855 95,549 71 W/E 136 05-16 1,373.90 10,257 17,157 5,639 8,579 12,743 54,375 40 W/E 143 05-23 1,342.80 16,084 11,979 6,102 3,239 8,680 46,084 34 W/E 150 05-30 1,414.90 6,018 13,766 1,791 4,695 26,270 19 W/E 157 06-06 1,376.90 5,070 7,704 4,764 3,678 3,533 24,749 18 W/E 164 06-13 1,373.50 4,142 8,592 2,411 3,468 2,409 21,022 15 W/E 171 06-20 1,120.90 4,427 4,088 2,833 4,161 2,861 18,370 16 W/E 178 06-27 1,399.30 4,187 4,935 2,400 1,497 2,308 15,327 11 W/E 185 07-04 2,501.50 5,710 5,710 2 Exhibit 3.30.19-4 Weekly Workload and Staff-hours Schedule Report (PCB-05-40) Below is an example layout of a Weekly Workload and Staff-hours Schedule Report (PCB-05-40). P-R-F PCB-05-40 WEEKLY WORKLOAD AND STAFF HOURS SCHEDULE REPORT DATE 12-23-2008 PAGE XX SERVICE CENTER PERIOD BEGINNING 01-01-2009 PERIOD ENDING 06-30-2009 REVISION NO. 4 Org 34000 DOCPROP FUNCTION 190 NUMBERNR PROGRAM 42900 8453 PERIOD CUM CUM CUM STD VOLUME STAFF-HRS STAFF-WKS VOLUME STAFF-HRS STD W/E 01-03 01-10 01-17 980.3 9,803 10 0.3 9,803 10 980.3 01-24 1,245.10 112,055 90 2.8 121,858 100 1,218.60 01-31 1,382.50 320,737 232 5.8 442,595 332 1,333.10 02-07 1,359.10 746,264 549 13.7 1,189,219 881 1,349.90 02-14 1,356.70 983,512 725 18.1 2,172,731 1,606 1,352.90 02-21 1,357.50 1,008,502 743 23.2 3,181,233 2,349 1,354.30 02-28 1,356.90 759,538 560 14 3,940,771 2,909 1,354.70 03-07 1,357.40 720,813 531 13.3 4,661,584 3,440 1,355.10 03-14 1,356.30 566,023 417 10.4 5,227,607 3,857 1,355.40 03-21 1,357.80 488,299 360 9 5,715,906 4,217 1,355.40 03-28 1,351.80 462,439 342 8.6 6,178,345 4,559 1,355.20 04-04 1,357.60 357,577 263 6.6 6,535,922 4,822 1,355.40 04-11 1,362.80 517,545 380 9.5 7,053,467 5,202 1,355.90 04-18 1,358.00 580,820 428 10.7 7,634,287 5,630 1,356.00 04-25 1,360.10 466,612 343 8.6 8,100,899 5,973 1,356.30 05-02 1,340.50 134,683 100 2.5 8,235,582 6,073 1,356.10 05-09 1,348.50 95,549 71 1.8 8,331,131 6,144 1,356.00 05-16 1,373.90 54,375 40 1 8,385,506 6,184 1,356.00 05-23 1,342.80 46,084 34 0.9 8,431,590 6,218 1,356.00 05-30 1,414.90 26,270 19 0.6 8,457,860 6,237 1,356.10 06-06 1,376.90 24,749 18 0.5 8,482,609 6,255 1,356.10 06-13 1,373.50 21,022 15 0.4 8,503,631 6,270 1,356.20 06-20 1,120.90 18,370 16 0.4 8,522,001 6,286 1,355.70 06-27 1,399.30 15,327 11 0.3 8,537,328 6,297 1,355.80 07-04 2,501.50 5,710 2 0.3 8,543,038 6,299 1,356.30 Exhibit 3.30.19-5 Managers Reports (PCC-60-40, PCC-62-40, PCC-46-40) Below is an example layout of the WP&C Performance and Cost Report (Managers Report (PCC-60-40)). PCC-60-40 MANAGERS REPORT XXXX SC WP&C PERFORMANCE AND COST REPORT PERIOD ENDED 05-16-2009 WKLY PERFORMANCE EVALUATION RECEIPTS ( PRODUCTION ) ( STAFF-HOURS ) ( RATE ) INDEX ( STAFF-HOUR STAT ) ORGANIZATION FUNCTION (VOLUME) (SCHED ACTUAL INVENTORY) (SCHED STAND ACTUAL ACTUAL) (STAND ACTUAL) OF ( DUE TO ) NET REMAIN PROGRAM COST RATE RATE PERF VOL EFF STATUS IN VAR PERIOD 34000 DOCPRFOP 210 EXAMINE 43111 D 1040 O PER 20019 21437* 504 504 8078 42.5 100 504 504 CUM 390090* 381138* 11828* 10143 10143 * 167634* 37.6 100 10143 10143 10143- 43113 1040PPNR PER -23* 2 2 27 11.5 100 2 2 CUM 63045* 63045* 1335 1335 19316 47.2 100 1335 1335 1335- 43115 BSC 1040 PER CUM 569 1193 50 50 831 23.9 100 50 50 50- 4311X SUMMARY PER 22487 25370 22485 365 521 530 8513 69.5 42.4 98 156 9 165 CUM 4735564 5202280 4727221 11843 76676 74682 78421 1222160 67.8 60.3 95 1994- 3739 1745 914- 43.2 63.3 43210 1040 FP PER 488 190723 54924* 2355 678 632 9725 81.0 86.9 107 1677- 46- 1723- CUM 478922* 998466 409834* 69088* 12706 5214 4829* 71974* 78.6 84.9 108 7492- 385- 7877- 10437 43213 1040FPNR PER 86279* 1336 1336 20132 64.6 100 1336 1336 CUM 616048* 523365* 92683* 7102 7102* 106320* 73.7 100 7102 7102 7102- 4321X SUMMARY PER 488 190723 141203 2355 2014 1968 29857 81.0 71.7 102 341- 46- 387- CUM 1094970 998466 933199 161771 12706 12316 11931 178294 78.6 78.2 103 390- 385- 775- 3335 70.1 75.8 43XXX SUMMARY PER 22975 216093 163688 2720 2535 2498 38370 65.5 101 185- 37- 222- CUM 5830534 6200746 5660420 173614 89382 86998 90352 1400454 62.6 96 2384- 3354 970 2421 * - CUMULATIVE FIGURE ADJUSTED THIS WEEK *** - INDEX OF PERFORMANCE EXCEEDS 999.4% The report is printed in OFP sequence. Reporting begins with the top two positions of Organization Code (e.g., B5000), the top two positions of Function Code and all five positions of Program Code. Summaries of overhead programs and Operation’s and Department totals are provided in a special section at the end of the report. OFP’s must have actual hours or scheduled hours reported before it will print on the Managers Report. Production volumes reported to the WP&C without actual or scheduled hours are excluded in the Managers Report. Hours from programs in 598XX series are excluded from Department, Operation, and Service Center totals. The columns in the Managers Report are described as follows: Column Heading Description Period Ended Period for which the data will be displayed. Receipts Volume The weekly volume of work received and is obtained from daily production reporting. Production Sched The scheduled work units for the period and is obtained from the master file in the scheduling program. Production Actual The actual work units produced or completed for the report period and are obtained from batch control or unit production records specified in production control. Production Inventory Balance of work units on hand at the end of the reporting period. This is a mathematical calculation of the previous weekly inventory plus weekly period receipts minus actual production achieved for the current period. Staff-hours Sched The number of staff-hours that have been scheduled to produce the work units in Item (3) is also obtained from the master file in the scheduling program. Staff-hours Stand The number of staff-hours that would have been used if the actual production had been accomplished at the standard production rate. For unmeasured programs, actual staff-hours used are recognized also as a standard staff-hour. This is a calculation of what was actually produced (Item #4) divided by the standard production rate (Item #10). Staff-hours Actual Reflects the actual staff-hours used. Data comes from the Employees Time Records, Forms 3081. Staff hours Actual Cost The dollar costs of the actual hours used based on hourly rates of pay Computed from Employee Time Report data and the cost per hour contained on the Employee Master File. Stand Rate Reports the standard production rate, which was projected in the Workload Schedules. Scheduled production divided by scheduled staff hour’s compute to stand rate. Stand Rate Second level standard rate appears under standard rate on the summary OFP and equals the actual production divided by the standard staff hours. Actual Rate Derived by dividing actual production by actual staff-hours. Index of Perf Measures Direct Staff-hours, in terms of a percentage, which relates staff-hours actually used to staff-hours that would have been used if production had been at standard production rates. The percentage is computed by dividing standard staff-hours by actual staff-hours.The advantage of this computation is that summaries of standard and actual staff-hours can be made at function and organization levels and an overall index computed which gives proper weight to each component. An index is also possible for an entire program considering all functions involved. For Overhead staff-hours, this is a ratio of scheduled vs. actual staff-hours. Staff-Hour Status-Vol Var Identifies the number of staff-hours above or below (−) those scheduled which are strictly due to the volume (number of work units) being above or below that which was scheduled. Determined by subtracting scheduled staff-hours from standard staff-hours. (Direct Staff-hours only). Staff-Hour Status Eff The number of staff-hours represented by above or below (−) standard production period. Determined by subtracting Std. Staff hours from Act Staff hours (Direct Staff hours only). (Staff-Hour Status-Net Status) The net staff-hour status that represents the difference of scheduled staff-hours less actual staff-hours. Since scheduled staff-hours represent the hours, which were budgeted in the Financial Plan, this figure represents the difference from plan. If hours are less than planned, a minus (−) sign will follow the figure. The status determined here is as of the date of the report. (Staff-Hour Status-Remain in Period) A status figure of staff-hours actually used to date compared to what has been projected for the entire period. The remainder is shown on the report. If the staff-hours scheduled for the period are greater than the actual cumulative to-date staff-hours, the difference is entered without a sign. If the cumulative to-date staff-hours exceed the staff-hours scheduled for the period, the difference is followed by a minus sign. Below is an example layout of the WP&C Program Analysis Report (PCC-62-40). P/R/F PCC-62-40 PAGE XX SC WP&C PROGRAM ANALYSIS REPORT PERIOD ENDED 05-16-2009 WKLY ( PERFORMANCE ) ( EVALUATION ) RECEIPTS ( PRODUCTION ) ( STAFF-HOURS ) ( RATE ) INDEX ( STAFF-HOUR STAT ) PROGRAM ORGANIZATION VOLUME (SCHED ACTUAL INVENTORY) (SCHED STAND ACTUAL ACTUAL) (STAND ACTUAL) OF ( DUE TO ) NET REMAIN FUNCTION COST RATE RATE PERF VOL EFF STATUS IN VAR PERIOD 01070 RECERT 37000 ACCTSVOP 420 ACCT SER PER 96 7 51 35 255 27 679 0.2 1.9 944 220 228- 8- CUM 1009 615 2228 443 737 2875 532 12963 0.8 4.2 523 2048 2253- 205- 389 01070 RECERT B1000 OP1AMDE1 710 TXACCACT PER 834 85 9.8 85- 85- CUM 11467 1170 9.8 1170- 1170- 1759 01070 RECERT B5000 OP1AMDE5 710 TXACCACT PER 1285 1058 142 142 3344 7.5 100 142 142 CUM 20042 20883 2783 3313 3313* 80493* 6.3 100 3313 3313 3313- 0107X 20000 / 3Z000 SUMMARY PER 35 255 27 679 944 220 228- 8- CUM 443 737 2785 532 12963 523 2048 2253- 205- 389 0107X 70000 / 8Z000 SUMMARY PER CUM 0107X 90000 / 9Z000 SUMMARY PER CUM 0107X A0000 / FZ000 SUMMARY PER 85 142 142 3344 100 57 57 CUM 2783 1170 3313 3313 80493 100 2143 2143 1554- 0107X PROGRAM SUMMARY PER 120 397 169 4023 235 277 228- 49 CUM 3226 1907 6098 3845 93456 159 4191 2253- 1938 1165- * - CUMULATIVE FIGURE ADJUSTED THIS WEEK ** - VOLUME POINT OF COUNT FOR PROGRAM *** - INDEX OF PERFORMANCE EXCEEDS 999.4% Below is an example layout of the WP&C Abstract Report (PCC-46-40). P/R/F PCC 46 40 PAGE 1 ABSTRACT REPORT SC WP&C PERFORMANCE AND COST REPORT PERIOD ENDED 05/16/2009 ORGANIZATION 34000 PROGRAM ACTIVITY 2B EMPLOYMENT CATEGORY PERMANENT 0 ( ) ( PAID ) ( UNPAID ) ( INTER-ACTY ) ( ) ---------------------------------MEMORANDUM------------------------------------------- WEEK ( BASIC ) ( OVERTIME ) ( OVERTIME ) ( SC DET-IN ) ( TOTAL ) ( NIGHT DIFF ) SUNDAY PREM (COMP LEAVE) ( SC DET-IN ) ENDED HOURS COST HOURS COST HOURS COST HOURS COST HOURS COST HOURS COST HOURS COST HOURS COST HOURS COST PERIOD DATA 04-04 849 21076 152 5422 1001 26498 118 290 04-11 831 20709 190 6838 3 61 68 2086 1091 29694 119 288 04-18 829 20670 252 8904 53 1649 1134 31223 143 347 16 392 04-25 835 20857 326 11473 1 24 1162 32354 152 365 05-02 844 21059 279 9791 18 441 1141 31291 149 368 1 24 05-09 835 20785 243 8650 1078 29435 125 292 05-16 845 21040 209 7548 1054 28588 132 324 TOTAL 16258 401448 1841 65283 69 2162 121 3735 18288 472628 1685 4112 38 1346 CUMULATIVE DATA 04-04 11239 276328 342 12079 48 1636 11629 290043 866 2128 21 930 04-11 12070 297037 532 18917 50 1697 68 2086 12720 319737 985 2416 21 930 04-18 12899 317707 784 27821 50 1697 121 3735 13854 350960 1128 2763 37 1322 04-25 13734 338564 1110 39294 51 1721 121 3735 15016 383314 1280 3128 37 1322 05-02 14578 359623 1389 49085 69 2162 121 3735 16157 414605 1429 3496 38 1346 05-09 15413 380408 1632 57735 69 2162 121 3735 17235 444040 1554 3788 38 1346 05-16 16258 401448 1841 65283 69 2162 121 3735 18288 472628 1685 4112 38 1346 P/R/F PCC 46 40 PAGE 2 ABSTRACT REPORT SC WP&C PERFORMANCE AND COST REPORT PERIOD ENDED 05/16/2009 ORGANIZATION 34000 PROGRAM ACTIVITY 2B EMPLOYMENT CATEGORY OTF / T {C / C} 1 ( ) ( PAID ) ( UNPAID ) ( INTER-ACTY ) ( ) ---------------------------------MEMORANDUM------------------------------------------- WEEK ( BASIC ) ( OVERTIME ) ( OVERTIME ) ( SC DET-IN ) ( TOTAL ) ( NIGHT DIFF ) SUNDAY PREM (COMP LEAVE) ( SC DET-IN ) ENDED HOURS COST HOURS COST HOURS COST HOURS COST HOURS COST HOURS COST HOURS COST HOURS COST HOURS COST PERIOD DATA 04-04 6282 117738 352 9831 7 125 6641 127694 1829 3317 48 218 6 126 04-11 6895 127340 660 18132 6 121 7561 145593 1899 3374 32 145 12 266 04-18 7247 133520 1319 35638 3 40 8568 169198 2190 3941 04-25 7664 139078 1376 36492 1 8 9040 175578 2302 4063 57 229 32 321 05-02 7149 131708 717 19603 11 189 7877 151500 1969 3547 83 336 05-09 6240 116946 379 10520 8 139 6626 127605 1502 2814 52 228 8 149 05-16 4452 86223 441 12295 9 170 4901 98688 1184 2285 26 453 TOTAL 101107 1902100 5703 155431 81 1639 106890 2059170 25755 47472 624 2741 80 1580 257 3660 CUMULATIVE DATA 04-04 61494 1167980 812 22751 45 972 62350 1191703 14723 27477 400 1803 34 712 225 3339 04-11 68379 1295179 1470 40836 51 1093 69900 1337108 16628 30860 432 1948 46 978 225 3339 04-18 75629 1428764 2787 76417 54 1133 78469 1506314 18821 34809 432 1948 46 978 225 3339 04-25 83286 1567741 4181 113351 54 1141 87521 1682233 21132 38886 489 2177 46 978 257 3660 05-02 90436 1699449 4902 133052 65 1330 95402 1833831 23103 42436 572 2513 46 978 257 3660 05-09 96665 1816234 5287 143725 72 1469 102024 1961428 24595 45231 624 2741 54 1127 257 3660 05-16 101117 1902457 5728 156020 81 1639 106925 2060116 25780 47516 624 2741 80 1580 257 3660 P/R/F PCC 46 40 PAGE 3 ABSTRACT REPORT SC WP&C PERFORMANCE AND COST REPORT PERIOD ENDED 05/16/2009 ORGANIZATION 34000 PROGRAM ACTIVITY 2B EMPLOYMENT CATEGORY * * PGM ACT SUMMARY XX ( ) ( PAID ) ( UNPAID ) ( INTER-ACTY ) ( ) ---------------------------------MEMORANDUM------------------------------------------- WEEK ( BASIC ) ( OVERTIME ) ( OVERTIME ) ( SC DET-IN ) ( TOTAL ) ( NIGHT DIFF ) SUNDAY PREM (COMP LEAVE) ( SC DET-IN ) ENDED HOURS COST HOURS COST HOURS COST HOURS COST HOURS COST HOURS COST HOURS COST HOURS COST HOURS COST PERIOD DATA 04-04 7131 138814 504 15253 7 125 7642 154192 1947 3607 48 218 6 126 04-11 7726 148049 850 24970 9 182 68 2086 8652 175287 2018 3662 32 145 12 266 04-18 8076 154190 1570 44542 3 40 53 1649 9702 200421 2333 4288 16 392 04-25 8499 159935 1702 47965 2 32 10203 207932 2454 4428 57 229 32 321 05-02 7993 152767 996 29394 29 630 9018 182791 2118 3915 83 336 1 24 05-09 7075 137731 622 19170 8 139 7704 157040 1627 3106 52 228 8 149 05-16 5297 107263 649 19843 9 170 5954 127276 1316 2609 26 453 TOTAL 117365 2303548 7544 220714 150 3801 121 3735 125178 2531798 27440 51584 624 2741 117 2926 257 3660 CUMULATIVE DATA 04-04 72733 1444308 1154 34830 93 2608 73979 1481746 15588 29605 400 1803 55 1642 225 3339 04-11 80449 1592216 2002 59753 101 2790 68 2086 82620 1656845 17612 33276 432 1948 67 1908 225 3339 04-18 88528 1746471 3571 104238 104 2830 121 3735 92323 1857274 19949 37572 432 1948 83 2300 225 3339 04-25 97020 1906305 5292 152645 105 2862 121 3735 102537 2065547 22412 42014 489 2177 83 2300 257 3660 05-02 105014 2059072 6291 182137 134 3492 121 3735 111558 2248436 24532 56932 572 2513 84 2324 257 3660 05-09 112078 2196642 6919 201460 141 3631 121 3735 119259 2405468 26149 49019 624 2741 92 2473 257 3660 05-16 117375 2303905 7569 221303 150 3801 121 3735 125213 2532744 27465 51628 624 2741 117 2926 257 3660 P/R/F PCC 46 40 PAGE 4 ABSTRACT REPORT SC WP&C PERFORMANCE AND COST REPORT PERIOD ENDED 05/16/2009 ORGANIZATION 34XXX PROGRAM ACTIVITY 2B EMPLOYMENT CATEGORY * * BRANCH SUMMARY ( ) ( PAID ) ( UNPAID ) ( INTER-ACTY ) ( ) ---------------------------------MEMORANDUM------------------------------------------- WEEK ( BASIC ) ( OVERTIME ) ( OVERTIME ) ( SC DET-IN ) ( TOTAL ) ( NIGHT DIFF ) SUNDAY PREM (COMP LEAVE) ( SC DET-IN ) ENDED HOURS COST HOURS COST HOURS COST HOURS COST HOURS COST HOURS COST HOURS COST HOURS COST HOURS COST PERIOD DATA 04-04 7131 138814 504 15253 7 125 7642 154192 1947 3607 48 218 6 126 04-11 7726 148049 850 24970 9 182 68 2086 8652 175287 2018 3662 32 145 12 266 04-18 8076 154190 1570 44542 3 40 53 1649 9702 200421 2333 4288 16 392 04-25 8499 159935 1702 47965 2 32 10203 207932 2454 4428 57 229 32 321 05-02 7993 152767 996 29394 29 630 9018 182791 2118 3915 83 336 1 24 05-09 7075 137731 622 19170 8 139 7704 157040 1627 3106 52 228 8 149 05-16 5297 107263 649 19843 9 170 5954 127276 1316 2609 26 453 TOTAL 117365 2303548 7544 220714 150 3801 121 3735 125178 2531798 27440 51584 624 2741 117 2926 257 3660 CUMULATIVE DATA 04-04 72733 1444308 1154 34830 93 2608 73979 1481746 15588 29605 400 1803 55 1642 225 3339 04-11 80449 1592216 2002 59753 101 2790 68 2086 82620 1656845 17612 33276 432 1948 67 1908 225 3339 04-18 88528 1746471 3571 104238 104 2830 121 3735 92323 1857274 19949 37572 432 1948 83 2300 225 3339 04-25 97020 1906305 5292 152645 105 2862 121 3735 102537 2065547 22412 42014 489 2177 83 2300 257 3660 05-02 105014 2059072 6291 182137 134 3492 121 3735 111558 2248436 24532 56932 572 2513 84 2324 257 3660 05-09 112078 2196642 6919 201460 141 3631 121 3735 119259 2405468 26149 49019 624 2741 92 2473 257 3660 05-16 117375 2303905 7569 221303 150 3801 121 3735 125213 2532744 27465 51628 624 2741 117 2926 257 3660 PERCENT PERCENT NON-SC DET-IN HRS WEEK PERCENT PERCENT NON-SC DET-IN HRS OH/DIR OH/TOT PER CUM ENDED OH/DIR OH/TOT PER CUM 04-04 81.6 44.9 04-11 78.6 44 04-18 74.5 42.7 04-25 69.8 41.1 05-02 67.1 40.1 05-09 66.3 39.8 05-16 65.3 39.5 The columns in the Abstract Report are described as follows: Column Heading Description Week Ended The Saturday week ending date. Basic Hours and Cost Regular hours including night differential and Sunday differential costs. Paid Overtime All hours and costs of work officially approved as paid overtime. Unpaid Overtime Hours and costs of officially approved credit hours or compensatory time. These appear at the time the employee works the overtime for consistency with other Performance and Cost figures. Inter-Activity SC Details In Includes hours and costs of employees detailed into an organization from an area covered by a different Management Activity Code. Total Hours The total Basic, Paid Overtime, Unpaid Overtime, Inter-Activity SC Details In, and Non-Service Center Details In hours. Total Cost The total of Basic, Paid Overtime, Unpaid Overtime, and Inter-Activity SC Details In costs. Night Differential Memorandum Items Hours and costs attributable to Night Differential pay. Basic salary costs are not included. Sunday Premium Pay Hours and costs attributable to Sunday Premium Pay. Basic salary costs are not included. Compensatory Leave Includes hours and costs for compensatory leave taken. Service Center Details In Includes details in from outside the organization, but from within the same Program Activity Code. For Example, a detail from organization 34000 to organization 35000 are both within Program Activity Code 2B. Total Total Hours and costs for the period. This line may be different from the cumulative total because adjustments to the WP&C correct only the cumulative data. Exhibit 3.30.19-6 Batch Profile Report (PCC-32-40) Below is an example layout of the Service Center Batch Profile Report (PCC-32-40). P/R/F PCC-32-40 PAGE XX PROGRAM 43111 OTFP1040 SERVICE CENTER BATCH PROFILE REPORT DATE 05-11-2009 140 SEQ CY ACT/ES REC PREVIOUS TRANSACTIONS LAST NOW REL CUM VOL TO BE BATCH NO NO VOLUME DATE REPORT IN DATE CLEARED CLEARED IDENT FUNCT FUNCT DIS DIS 9896 20 229 119 180/210//190/230//////// 35-230 610 133] 229 PY * 9909 19 967 114 180/210///190/230///// 610 610 127] 967 ISRPPPD 9920 21 232 123 180/210 190/230////////// 35-230 610 135] 232 ISRPPY 9921 21 722 123 180/210///190/230///// 35-230 610 135] 722 PYREB 9925 20 21 120 180/210///190/230////// 35-230 610 133] 21 PY 9927 20 680 119 180/210///190/230////// 35-230 610 132] 680 PY/REB 9929 20 36 117 180/210///190/230///// 35-230 610 128] 36 ISRP/PY 9935 20 32 118 180/210///190/230////// 35-230 610 131] 32 PY/REB * 9936 20 1140 121 180/210///190/230//// 610 610 134] 1140 DEL * 9937 20 936 121 180/210///190/230//// 610 610 134] 936 DEL * 9946 20 251 121 180/210///190/230//// 610 610 134] 251 BANKDEL 9950 20 57 121 180/210///190/230///// 35-230 610 134] 57 BANKPY 9953 20 25 119 180/210///190/230///// 35-230 610 132] 25 BANK/PY 9954 20 28 120 180/210///190/230///// 35-230 610 133] 28 BANK/PY * 9964 20 998 120 180/210///190/230/// 610 610 133] 998 PYREB 9965 20 24 120 180/210///190/230///// 35-230 610 133] 24 BANKPY 9968 20 23 119 180/210///190/230///// 35-230 610 132] 23 BANKPY 9969 20 39 120 180/210///190/230///// 35-230 610 133] 39 BANKPY * 9971 21 340 124 180/210///190/230/// 610 610 135] 340 BANKDEL * 9972 21 248 124 180/210///190/230//// 610 610 135] 248 BANKDEL 9974 21 65 124 180/210///190/230///// 35-230 610 135] 65 BANK/PY 9975 21 40 124 180/210///190/230///// 35-230 610 135] 40 PY * 9982 20 521 121 180/210///190/230//// 610 610 134] 521 PY * 9983 20 8 118 180/210///190/230//// 610 610 131] 8 PY INVENTORY FUNCTION 210 190 230 610 VOLUME 11275 2213 4537 59631 CYCLE TOTAL 09 25 0 0 0 14 0 0 2 2 18 0 0 9 0 19 0 0 0 2395 20 2 55 268 9355 21 69 0 127 29040 22 4696 1752 3676 18746 TOTAL ACTUAL / ESTIMATED VOLUME 18025 CLEARED-DIS-TODAY 18902 LESS CLEARED DIS - TOTAL 61327 RELEASE DATE COLUMN * - CURRENT DATE IS EQUAL TO OR WITHIN 3 DAYS PRIOR TO RELEASE DATE ] - CURRENT DATE IS LATER THAN THE RELEASE DATE The columns in the Batch Profile Report are described as follows: Column Heading Description Program Number The number assigned to each form or document. Date The report calendar date and the three-digit slash(/) Julian date. Error Codes A one-letter code indicating problems with the BPR data. If more than one error is detected; only on error code will be printed. Priority order of the codes is E, B, A, C, F and D.Code ConditionA. Establishing a batch on the BPR with a "From Function" other than 180.B. The "Cum Volume Cleared DIS" is greater than the total volume of the batch.C. An attempt is made to make an adjustment code 3 adjustment and the batch is not in Function 230 or 450.D. An attempt to establish a batch with a release date less than the current report date, or the received date is greater than the current received date.E. A function in a workflow sequence has not reported the batch as complete, but a later function in the sequence has reported the batch as complete. (e.g., a missing input record.) Unmatched program codes will also appear with error code (E).F. An adjustment record is received for a batch established on the BPR. *The asterisk, although not an error code, appears in the same column as the error codes. It indicates that the batch has cleared all service center processing and will be dropped from the BPR the following day. Note: Adjustment data that results in error codes C or F will not post to the batch master file. Adjustment actions that result in the other codes will be posted. Batch Sequence Number A four-digit number that identifies a specific Batch. The current system is zero filled to the right of the batch sequence number which can be a low as 1. Cycle Numbers The service center cycle in which the scheduled release date falls. Actual/Estimated Volume The number of documents within the batch. An "E" following the volume indicates an estimated volume. Received Data The Julian date of the earliest received return in the batch. Previous Transactions Lists the functions that have completed processing of the batch. Each following a function number indicates the passage of one working day. The absence of a slash indicates that the batch went to the next function of same day it was received. (The BBTS will not show slashes: it will show the actual number of days the batch is in each function.) Last Reported Function The last function that the batch cleared. The two digits that occasionally appear in front of the function identify the branch of that function. They also indicate that the batch was released by that function the previous day. Now in Function The batch is now in this function. Release Date This last day that the batch should clear all service center processing (including Function 610) to meet the workday cycle (for example, 11-day or 16-day cycles). An asterisk (*) indicates that the current date is equal to or within 3 days before the release date. A right bracket (]) indicates that the current date is later than the release date. Cum Volume Cleared DIS The partial or total batch volume completed and released from DIS. Partial volumes will also show the volume yet to be cleared in the "To be Cleared DIS" column. Also shown is the total volume of batches that have cleared DIS and shifted to Function 610 (System Operations). To Be Cleared DIS The number of documents in the batch that have not yet cleared DIS. When all of the documents in the batch have cleared DIS, the batch is automatically shifted to Function 610 on the BPR. Batch Identification A seven-position field to be used at the service center’s option. Whatever is in positions 73-79 of the Batch and Production Control Record will be printed here. Inventory Function/Volume A list of the inventory by function. Under the total inventory by function is another list that shows the inventory by function separated by cycles. Volume figures are the total of the batch volume with the function number in "Now in Function." The inventory for Function 610 includes the total of all batches that have shifted to Function 610 on the BPR that day. Cycle Total Shows the inventory by function separated by cycles. Volume figures are the total of all batch volumes with that function number in "Now in Function." The inventory for Function 610 includes the total of all batches that have shifted to Function 610 on the BPR that day. Total Actual/Estimated Volume The total of all the figures in the "ACT/ES Volume" column. Cleared DIS Today/Total The figure for "Today" indicates the volume that cleared DIS on the day of the report. The "Total" figure is the total of Column 12, Cum Volume Cleared DIS. A manager can use the BPR to estimate the volume coming into the unit and calculate the number of staff hours needed for processing. Exhibit 3.30.19-7 Daily Production Report — Organization Sequence (PCC-24-40) Below is an example layout of the Daily Production Report - Organization Sequence (PCC-24-40). S/R/F PCC-24-40 PAGE XX DAILY PRODUCTION REPORT - ORGANIZATION SEQUENCE 05-21-2009 ORG 35000 DATCONOP PERIOD DATA CUMULATIVE DATA OPENING ACTUAL ACTUAL CLOSING ACTUAL ACTUAL SCHED FUN PROG PROG TITLE INV. RECEIPTS SCHEDULED PRODUCTION INV. RECEIPTS SCHEDULED PRODUCTION STATUS REM. 230 11920 1041ES 0 0 0 0 0 0 0 0 0 .0 230 15500 BMF TRNS 18 7 20 1 24 1,616 4,183 1,592 2,591- 70.6 230 15501 REV RCPT 0 0 0 0 0 1,305 0 1,305 1,305 .0 230 15502 1120F 0 0 0 0 0 0 0 0 0 .0 230 15507 5466B 0 0 0 0 0 96 0 96 96 .0 230 15910 SBMF ERR 1 0 0 0 1 33 0 33 33 .0 230 35700 COMP REP 0 0 0 0 0 0 0 0 0 .0 230 35702 6574 0 0 0 0 0 0 0 0 0 .0 230 35709 6162 0 0 0 0 0 0 0 0 0 .0 230 38300 DATACONT 0 0 0 0 0 1,225 992 1,225 233 29.2 230 38600 ITRANSFR 10 0 0 0 10 3,576 3,150 3,566 416 1.9 230 38601 3552 0 0 0 0 0 0 0 0 0 .0 230 38620 BTRANSFR 0 0 0 0 0 4 0 4 4 .0 230 38621 3552 0 0 0 0 0 4 0 4 4 .0 230 39910 DETO SAT 0 0 0 0 0 0 0 0 0 .0 230 43110 1040OTFP 8,612 290 8,000 1,451 7,451 2,874,983 3,600,600 2,867,534 733,066- 22.5 230 43112 PRIOR YR 6,581 2,021 0 4,719 3,883 276,136 0 272,253 272,253 0.0 230 43113 1040TCTL 0 0 0 0 0 0 0 0 0 .0 230 43115 PARTPAID 668 58 0 123 603 80,983 0 80,380 80,380 .0 230 43116 FY08STIM 0 0 0 0 0 270 0 270 270 .0 230 43117 NOREFUND 50 230 0 126 154 229,226 0 229,072 229,072 .0 230 43118 DECEDENT 606 347 0 484 469 53,342 0 52,873 52,873 .0 230 43119 PRIOR YR 0 0 0 0 0 0 0 0 0 .0 Exhibit 3.30.19-8 Daily Production Report — Program Sequence (PCC-22-40) Below is an example layout of the Daily Production Report - Program Sequence (PCC-22-40). P/R/F PCC 22 40 SERVICE CENTER DAILY PRODUCTION REPORT - PROGRAM SEQUENCE 05/11/2009 PROG 4311X SUMMARY PERIOD DATA CUMULATIVE DATA OPENING ACTUAL ACTUAL CLOSING ACTUAL ACTUAL SCHED ORG FUN FUN TITLE INV. RECEIPTS SCHEDULED PRODUCTION INV. RECEIPTS SCHEDULED PRODUCTION STATUS REM. 31000 110 MAIL HAN 00 15,476 15,476 15,476 00 4,004,640 3,946,142 4,004,640 58,498 04.9 170 MDACTCON 00 00 00 00 00 36 00 36 36 00.0 180 BATCHING 33,612 15,477 15,476 18,184 30,905 4,004,661 3,946,142 3,973,756 27,614 05.6 150 DEPOSIT 00 00 00 00 00 36 00 36 36 00.0 34000 210 EXAMINE 387,055 18,184 75,826 73,990 331,249 3,973,457 3,555,956 3,642,208 86,252 13.4 190 NUMBERNR 21,539 73,989 76,436 72,859 22,669 3,640,550 3,480,130 3,617,881 137,751 13.9 35000 230 ISRP 232,338 72,860 70,192 60,145 245,053 3,619,874 3,179,431 3,374,821 195,390 19.6 43000 610 SYSTOPNS 56,216 60,145 72,388 56,216 60,145 3,374,821 3,109,239 3,314,676 205,437 20.9 910 ERR 89,576 24,238 00 25,141 88,673 940,210 00 851,537 851,537 00.0 920 REJ 18,008 1,583 00 885 18,706 47,157 00 28,451 28,451 00.0 930 BOB 50 228 00 100 178 10,370 00 10,192 10,192 00.0 940 BL DEL 01 00 00 00 01 55 00 54 54 00.0 950 TO MCC 26,399 56,270 72,388 72,125 10,544 3,206,214 3,109,239 3,195,670 86,431 23.7 960 PROG DEL 00 22 00 22 00 847 00 847 847 00.0 970 REINPUTS 00 01 00 01 00 57 00 57 57 00.0 TOTAL PROGRAM END INV. 808,123 EXCLUDING ERR RES, ERR CORR, PROG DEL, AND REINPUTS The columns in the Daily Production Report are described as follows: Column Heading Description Program Number The five-digit code assigned to the form being processed, shown to the immediate right. Organization The five-digit code assigned to the branch responsible for the listed function. Function/Function Title The three-digit code and the title of the function. Opening Inventory The previous day’s Daily Closing Inventory, plus or minus any Adjustments. Period Actual Receipts Receipts for Function 110 obtained from the receipt field on the pipeline receipts record. All other receipts are obtained from Batch and Production Control Records. Period Scheduled Production Obtained from the Service Center Workload Schedules. Period Actual Production Obtained from Batch and Production Control Records. Closing Inventory The Opening Inventory plus the period Actual Receipts minus the period Actual Production. Cumulative Actual Receipts The cumulative actual receipts since January 1. Cumulative Scheduled Production In January through June, the cumulative scheduled production volume since January 1, taken from workload schedules.In July through September, this is the actual production from January through June plus the scheduled production from July 1 to date.In October through December, this is the January – September actual production plus the scheduled production from October to date. Cumulative Actual Production The cumulative actual production since January 1. Status The cumulative Actual Production minus the Cumulative Scheduled Production. A positive number indicates production volume over the schedule. A negative number indicates volume under the schedule. Scheduled Percentage Remaining to the End of the Scheduling Period The Actual Volume processed (divided by) the total volume scheduled (plus prior period actual) for the period (January 1 until the end of the period). These percentages are computed as follows: To the end of JunePercentage Remaining = 100% (minus) Cumulative Actual Production (divided by) Scheduled Volume (1/1 – 6/30) To the end of SeptemberPercentage Remaining = 100% (minus) Cumulative Actual Production (divided by) Cumulative July--Sept. Scheduled Production(1/1 – 6/30) + Actual Volume To the end of DecemberPercentage Remaining = 100% (minus) Cumulative Actual Production (divided by) Cumulative Oct.--Dec. Scheduled Production(1/1 – 9/30) + Actual Volume Total Program Ending The total of the closing inventories excluding any negative inventories.There should never be any inventories in Program Deletes (960) and Reinputs (970).Volumes in Function 910 through 970 are taken from project PCD (565). See IRM 3.30.40. Exhibit 3.30.19-9 Guide for Adjusting DPR from Changes Written on Control Data Analysis Report (PCD 565) Below is a Guide for Adjusting DPR from Changes Written on Control Data Analysis Report (PCD 565). Guide for Adjusting DPR from Changes Written on Control Data Analysis Reports (PCD 565) When Change is Made ADJUST Matching on Daily Production Report: Column Heading: 180 910 920 930 940 950 960 970 R I R P I R P I R P I R P I R P I R P R P BPS AND Error Analysis Raw Errors + + - - Errors Cleared to MCC (Good Transactions CUM should be changed) + - + + Error to Reject + - + + Reinputs + + + - + + Reject Analysis Report Raw Rejects + + - - Rejects Cleared to MCC (Good Transactions CUM should be changed) + - + + TRD - Reinput + + + - + + TRD - Program Deletes + - + + Unpostable Rejects + + - - BOBS Analysis New BOBS (Cumulative) + + - - BOBS Cleared + - + + BOBS Cleared to MCC (Good Transactions CUM should be changed) + - + + BOBS to Reject + + + - BOBS to Error + + + - Block Deletion Analysis New Block Deletes (Good Transactions CUM should be changed) + + - - Block Delete Releases Reinput + + + - + + Program Deletes + - + + Good Tape Transactions Only + - NOTE: All Marks above are based on "Plus" changes to the reports. Minus changes would reverse the signs. Never adjust inventory on codes 960 and 970 R = Receipts P = Production I = Inventory TRD = Today's Reject Deletions Exhibit 3.30.19-10 Employee Detail Summary (PCC-42-40) Below is an example layout of the Employee Detail Summary Report (PCC-42-40). P/R/F PCC 42 40 PAGE 1 EMPLOYEE DETAIL SUMMARY SC WP&C PERFORMANCE AND COST REPORT PERIOD ENDED 05/16/2009 FROM ORG 35000 PERIOD DATA TO ORG 35000 ( DETAIL TO ) ( DETAIL FROM ) ( PERMANENT ) ( TEMPORARY ) ( PERMANENT ) ( TEMPORARY ) ORG/ ( REGULAR ) ( OVERTIME ) ( REGULAR ) ( OVERTIME ) ( REGULAR ) ( OVERTIME ) ( REGULAR ) ( OVERTIME ) ACTY HOURS COST HOURS COST HOURS COST HOURS COST HOURS COST HOURS COST HOURS COST HOURS COST 1D000 40 689 5H 40 689 23000 30 1041 2B 30 1041 37000 64 1280 2B 64 1280 81000 40 746 7B 40 746 B6000 40 835 2C 40 835 TOTAL 40 689 104 2026 70 1876 5H 40 689 2B 64 1280 30 1041 7B 40 746 2C 40 835 ** P/R/F PCC 42 40 PAGE 2 EMPLOYEE DETAIL SUMMARY SC WP&C PERFORMANCE AND COST REPORT PERIOD ENDED 05/16/2009 FROM ORG 35000 CUMULATIVE DATA TO ORG 35000 ( DETAIL TO ) ( DETAIL FROM ) ( PERMANENT ) ( TEMPORARY ) ( PERMANENT ) ( TEMPORARY ) ORG/ ( REGULAR ) ( OVERTIME ) ( REGULAR ) ( OVERTIME ) ( REGULAR ) ( OVERTIME ) ( REGULAR ) ( OVERTIME ) ACTY HOURS COST HOURS COST HOURS COST HOURS COST HOURS COST HOURS COST HOURS COST HOURS COST 1C000 16 346 2E 16 346 1D000 776 13352 25 646 5H 776 13352 25 646 23000 240 8046 5 78 30 1041 2B 240 8046 5 78 30 1041 31000 168 3095 13 353 281 4557 6 139 80 2177 2B 168 3095 13 353 281 4557 6 139 80 2177 34000 216 3147 9 194 2B 216 3147 9 194 36000 40 642 2B 40 642 37000 882 17591 13 394 2B 882 17591 13 394 81000 159 2965 7B 159 2965 82000 646 20129 3 119 7F 646 20129 3 119 B3000 56 1214 2 31 2C 56 1214 2 31 B4000 152 3100 3 62 2C 152 3100 3 62 B6000 40 835 2C 40 835 G8000 40 798 9X 40 798 TOTAL 1830 44623 41 117 1559 28686 28 726 318 6988 5 93 120 2819 2E 16 346 5H 776 13352 25 646 2B 408 11141 13 353 1384 25374 28 726 30 1041 120 2819 7B 159 2965 7F 646 20129 3 119 2C 248 5149 5 93 9X 40 798 ** Exhibit 3.30.19-11 Error Messages Below is a list of Error Messages: ERROR MESSAGES Unmatched Delete OFP Not found on BPC Adj. Unmatched Adjustment Not on OFP Cons To OFP Not on Cons Record Not Added Invalid Card Code Abstract Rec Not Found Invalid Adjustment Code Delete OFP Not found in Daymast Invalid Type Code OFP Code Not Found Invalid Funding Code Program Not On DPR Control Exhibit 3.30.19-12 Batch and Production Control Record Layout Below is the layout of the Batch and Production Control Record. Shown is the Batch and Production Control Record Layout. It contains elements of a pipeline receipts log record, a control record establishing an estimated receipt volume for those functions prior to numbering of documents; and a pipeline production record, which records movement from one function to another function. For detailed descriptions of each of the 80 columns, see IRM 3.30.19.5.3 and IRM 3.30.19.5.4. Please click here for the text description of the image. Exhibit 3.30.19-13 Unit Production Record Layout Below is the layout of the Unit Production Record. Shown is the Unit Production Record Layout. It contains guidelines for how Unit Production Records should be prepared for each needed OFPs in order to report receipts and processed volumes for programs not under batch control. For detailed descriptions of each of the 80 columns, see IRM 3.30.19.5.6. Please click here for the text description of the image. Exhibit 3.30.19-14 Production Adjustments Record Layout Below is the layout of the Production Adjustments Record. Shown are the DPR Production Adjustments and the BPR Adjustments Record Layouts. They contain guidelines for how Production Adjustment Records should be prepared. For detailed descriptions of each of the 80 columns, see IRM 3.30.19.5.9.3, IRM 3.30.13.5.9.4, and IRM 3.30.13.5.11. Please click here for the text description of the image. Exhibit 3.30.19-15 Abstract Adjustments Record Layout Below is the layout of the Abstract Adjustments Record. Shown are four Abstract Adjustments Record Layouts. They contain guidelines for how Abstract and Managers Performance Adjustments, Abstract Adjustments, and Employee Detail Adjustments should be prepared. For detailed descriptions of each of the 80 columns, see IRM 3.30.19.5.9.4. Please click here for the text description of the image.